§ 29-94 — Procedure for inspections
Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 29-94
Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/2bf484b3-554a-40aa-ad67-0f1f94f8bf61
Sec. 29-94. - Procedure for inspections.
(a) Inspection of work in progress on waterfront improvements shall be carried out as set forth in the building code, according to the following sequence: (1) Layout inspection after survey for location and before excavation is begun. (2) Pile inspection during the driving of piles and after all piles are driven, but before placing of any concrete. (3) Foundation inspection after necessary excavations have been made, forms erected and reinforcing steel placed, but before concrete is placed. (4) Reinforcing inspection after any reinforcing steel is in place and tied, but before the placing of any concrete. (5) Electrical, mechanical or plumbing inspections after installation of such named equipment, but before any part of such installation is covered or concealed from view. (6) Sheet pile or pre-cast wall panel installation for bulkheads or seawalls after placement of sheet piling/wall panels, joint water proofing materials, and weep hole one-way valves (where applicable) but before the voids behind the wall are filled and concealed from view. (b) In the event the waterfront improvement includes any electrical, mechanical and plumbing work, a permit for such work shall be required in addition to the permit covered by this article, and the permit fee for such electrical, mechanical and plumbing work shall be as set forth in chapter 10 of the City Code.
(Code 1967, § 27-34; Code 1980, § 29-54; Ord. No. 13315, § 2, 3-8-12; Ord. No. 13980, § 3, 3-25-21)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.
