§ 8-368 — Compulsory connection to water and well abandonment
Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 8-368
Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/2c12b673-4e52-4f1a-8ca3-f17cce8250fd
Sec. 8-368. - Compulsory connection to water and well abandonment.
(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning. Cross-connection means a connection or potential connection between any part of a water supply system and another environment containing substances that, under any circumstances, would allow the substances to enter the water supply system by means of back siphonage or back pressure. Licensed pump installer means any individual who has obtained a license under Wis. Stats. § 280.15(2m), and Wis. Admin. Code § NR 146.04, as a pump installer and has paid the annual license fee under Wis. Stats. § 280.15(2m)(c)2. Licensed well driller means any individual who has obtained a license under Wis. Stats. § 280.15(2m), and Wis. Admin. Code § NR 146.04, as a water well driller and has paid the annual license fee under Wis. Stats. § 280.15(2m)(c)1. Municipal water system means a community water system owned by a city, village, county, town, town sanitary district, utility district, public inland lake and rehabilitation district, municipal water district or a federal, state, county or municipal-owned institution for congregate care or correction, or a privately owned water utility serving the foregoing. Pump installation means the pump and its associated pressure system including any equipment and material needed to withdraw, obtain, discharge, and store water from a well or a spring. The pump installation includes the spring box, reservoir, pump, pump drop pipe, check valves, well cap or seal, pitless adapter, pitless receiver tank, pitless unit, above-ground discharge unit, associated discharge piping and associated connections, valves, and appurtenances, pressure tank, sampling faucet, water storage or pressure vessel or structure, the electrical wiring and controls needed to operate the pump or pressure system, and any chemical addition, water treatment device, or yard hydrant upstream of the water storage or pressure vessel or building control valve. Unused well means a well which is not in use or does not have a functional pumping system. Well means any drillhole or other excavation or opening deeper than it is wide that extends more than ten feet below the ground surface constructed for the purpose of obtaining groundwater. Well filling and sealing means the filling and sealing of a well, drillhole, pit, or reservoir with materials in accordance with Wis. Admin. Code NR Ch. 812 so the well, drillhole, pit, or reservoir will not act as a vertical conduit to contaminate another well, groundwater, or an aquifer. (b) Compulsory connection to municipal water main. The owner of any building intended for human habitation or occupancy abutting on any street, alley, or other thoroughfare in which a municipal water main has been extended and is available for service, shall cause to be made a water connection thereto within 120 days of notification of said extension and availability. Except as provided in subsection (4), the owner shall abandon any existing source of water currently being used for said building. (c) Well filling and sealing required. All unused wells and wells located on premises served by the municipal water system shall be filled and sealed in accordance with the terms of Wis. Admin. Code NR Ch. 812 not later than one year from the date the municipal water system is available. (d) Well filling and sealing procedures. All wells required to be filled and sealed under this section shall be filled and sealed according to the procedures and standards established in Wis. Admin. Code NR Ch. 812. A copy of the State Department of Natural Resources filling and sealing report shall be submitted by the well owner to the Water Utility within 30 days of the completion the well filling and sealing. (e) Private well operation permit. (1) The Green Bay Water Utility may grant a permit to a private well owner to operate a private well for a period of five years provided the conditions of this section are met. A private well operation permit may be renewed provided that the conditions of this section are met. (2) Permit applications shall be made on the form provided by the Water Utility. (3) The Water Utility General Manager or their designee may conduct inspections or have water quality tests conducted at the applicant's expense to obtain or verify information necessary for consideration of a permit application. (4) The Water Utility may only grant a private well operation permit if all of the following conditions are met. a. The owner pays the private well operation permit fee as provided in the City Fee Schedule. b. The demonstrates a need for use of a private well. c. The owner operates the well in accordance with Wis. Admin. Code NR Ch. 812. d. Prior to issuing or renewing the permit, a minimum of one safe sample has been taken from the private well to establish that the water is bacteriologically safe. e. The well and pump system are functional and have been evaluated by a licensed well driller or pump installer and certified to comply with Wis. Admin. Code NR Ch. 812. The evaluation shall be documented on a form provided by the State of Wisconsin Department of Natural Resources. (5) Hearing when permit is denied: Any person whose application for a permit under this section has been denied may request and shall be granted a hearing on the matter before the Water Commission. (f) Unapproved cross-connections between any private well and pump installations and the municipal water system. Unapproved cross-connections between any private well and pump installations and the municipal water system are prohibited. (g) Hardship. When, in the judgment of the Water Commission, after recommendation from the Water Utility, it would be inappropriate to apply literally a provision of this section because hardship would result, the Water Commission may waive or vary such provisions so that substantial justice may be done and the public interest secured.
(Ord. No. 13-24, § 1, 7-30-2024)
Ask a question about Green Bay law
Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.
