8-2-22. - Sidewalk Required Prior to Issuance of Building Permit.
(a) Any person who applies for a building permit or permits for a new building or structure or for an addition, alteration, or repair whose cost within any twenty-four-month period exceeds twenty-five percent of the value of the existing building or structure, regardless of the zone, on a lot where sidewalks meeting the requirements of this chapter do not exist, shall submit plans to construct sidewalks, indicating the location of the sidewalk as it extends along the length of the applicant's property. (b) For purposes of this section, the city manager shall determine the value of the existing building or structure based upon the current data and information available to the manager. (c) The manager shall determine whether the sidewalk plans meet the standards for sidewalks of this chapter. (d) Sidewalks shall be constructed in accordance with the plans as finally approved by the city manager and before the occupation of the building. (e) The applicant for the building permit shall agree in writing that before or after the construction of the sidewalk the applicant will grant to the city an easement for use by the public as a right-of-way for sidewalk purposes of the area in which the sidewalk lies, if such area is not already in the public right-of-way. (f) Notwithstanding any other provisions of this section, a building permit may be issued when a plot plan is submitted indicating the location and alignment of the sidewalk along the length of the applicant's property but before construction plans are submitted or a sidewalk is constructed if: (1) The land being built upon fronts on a street that is not improved to acceptable city standards and the applicant signs an agreement, satisfactory to the city attorney, to construct the sidewalk whenever the city manager determines that it is needed by the area residents and the general public, considering the improvement of the street fronting the land and the existence of sidewalks or portions of sidewalks on the property and the area adjacent to the land and the property in the vicinity of the land; or (2) The city manager determines that the construction of sidewalks is not immediately necessary to protect area residents for the public safety and the applicant signs an agreement and covenant running with the land, satisfactory to the city attorney, to construct the sidewalk when the city manager determines, based on the density of population of the immediate area, the neighborhood needs, the condition of the sidewalk fronting the land and the existence of sidewalks or portions of sidewalks on the property in the area adjacent to the land and the property in the vicinity of the land, that the needs of area residents and the general public require sidewalk construction. (3) The applicant under either Paragraph (f)(1) or (f)(2) of this section shall, before a building permit is issued, grant to the city an easement for the right-of-way of the sidewalk to be constructed at a later time. The easement shall provide for immediate use of the easement area before sidewalk construction by the public as a right-of-way for sidewalk purposes.
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.