§ 15.33.150 — Proximate blasting permit requirements

Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 15.33.150

Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/2c501829-4b24-4fcb-9fcf-2f85bad5bb6d

15.33.150 - Proximate blasting permit requirements.

A. [Safety precautions.] In addition to all other requirements of this chapter, the following safety precautions shall be taken for proximate blasting: 1. Additional seismographs may be required by the City of Henderson or its consultant; 2. The blast plan shall also note the measured distance between the seismograph and the nearest blast hole; 3. Only packaged, measured or metered explosives shall be used; 4. A drill log shall be maintained on all proximate blasting to allow the blasting supervisor to monitor the drilling process closely and to take the appropriate action if an anomaly occurs; 5. Drill hole depth shall be held to a maximum of 20 feet of solid rock when conducting proximate blasting; 6. The diameter of the drill hole shall not exceed three inches when conducting proximate blasting; 7. Stemming material shall be one-half inch angular gravel or crushed stone; 8. All proximate blasts shall be videotaped at a distance and direction that will allow visual capture of any fly rock. A copy of the videotape shall be provided to the fire chief and building and fire safety director within 24 hours upon request; 9. The fire chief and building and fire safety director may require protective cover such as matting used on top of proximate blasts to prevent fly rock. The type of and quantity of cover shall be as determined by the contractor, but not less than simple topsoil or a manmade material like synthetic rubber; 10. The approximate powder factors anticipated. B. Notification plan. The notification plan shall consist of the following: (i) blasting notification mailing, (ii) neighborhood meeting. 1. The director of building and fire safety and the fire chief are authorized in their joint discretion to: a. Allow one blasting notification mailing and/or neighborhood meeting for a project that involves multiple permits such as, but not limited to, projects requiring permit renewals; geographic proximity of proposed blast areas in relation to other development; and master planned communities; b. Allow one blasting notification mailing and/or neighborhood meeting for multiple projects that involve multiple permits such as, but not limited to, projects subject to a master development agreement; contiguous projects; and master homeowner associations; c. Require additional blasting notification mailing(s) and/or neighborhood meeting(s) if the scope of the project substantially changes or otherwise warrants additional information sharing with the public such as, but not limited to, substantial acreage added to permit area; or change to blasting plan; d. Not require blasting notification mailing and/or a neighborhood meeting for permit applications that fall within the scope and notification distance requirements of existing permits by the same blasting contractor. 2. Blasting notification mailing. A blasting notification mailing shall be sent to all property owners, and homeowner associations, with a copy provided to the City of Henderson departments of building and fire safety, and neighborhood services, within the scaled notification distance from the perimeter of the assessor's parcel numbers or applicant's designated blast site(s) upon which the blasting permit is requested no less than seven days and no greater than 21 days prior to the start of blasting operations. When fewer than five different property owners are within the notification distance, the applicant may propose a custom plan for informing these owners pursuant to this section. The fire chief and building and fire safety director may accept or modify this plan. The notification distance for a blasting notification mailing shall be based on Figure 3. The distance from the perimeter of the assessors parcel number containing the closest blast site for notifying property owners is the point where the weight intersects the line on the chart. The weight is based on the applicant's statement stating the maximum anticipated pounds of explosives in any single delay. FIGURE 3 [image omitted; see the official code] Figure 3 is based on the following equation: D (ft) = 210 * W ½ (lbs) where D is the scaled notification distance and W is the maximum charge weight per eight ms delay. Upon request, the City of Henderson will provide a mailing list for all residences within the scaled notification distance from the perimeter of the assessor's parcels upon which the blasting permit is requested. A fee shall be charged to recover the cost of providing this service. The applicant may request to have the city prepare and process the mailing for the neighborhood meeting and shall charge a fee to recover the cost of providing this service. The blasting notification mailing shall have a return address identifying the applicant. The contents of the notice shall include, but are not limited to, the following: a. Why the blasting is necessary; b. Name of blasting company; c. When the blasting will occur, i.e., date range and approximate times of blasting; d. Where the blasting will be conducted. A map shall be provided; e. How to contact the blasting company; f. Date, time, location of the required neighborhood meeting. When no blasting occurs for a period of 30 or more days, a new blasting notification mailing shall be sent. The notice shall include subsections (2)(a) through (2)(e) of this section. 3. Neighborhood meeting. The location of the neighborhood meetings are subject to the approval of the fire chief and building and fire safety director. A neighborhood meeting will be conducted prior to the issuance of a proximate blasting permit by representatives of the blasting company, the developer, and the vibration consultants implementing the monitoring program. Information provided to neighborhood residents will include, but is not limited to: a. A general description of the blasting activities, including an explanation of the drilling and blasting process; b. The anticipated duration of the blasting; c. An anticipated schedule of blasts, including estimated dates and times of blasting; d. The qualifications of the blasters; e. The warning signals for blasting and the all clear signal; f. Measures to be taken for the control of ground vibrations, air blast, fly rock, fumes and dust; g. Contact information for submitting questions or complaints; h. Insurance carrier contact information for submitting claims; i. A description of the vibration monitoring process. C. Pre-blast and post-blast surveys. Before proximate blasting may commence, the blasting company shall complete pre-blast surveys of all buildings 300 feet or less from the nearest blast hole. Pre-blast and post-blast surveys shall comply with the following: 1. Pre-blast surveys. a. At least 21 days before initiation of blasting, the permit applicant shall notify, in writing, all property owners within 300 feet of the permit area, of their eligibility to request a pre-blast survey and the procedure for requesting a survey; b. The pre-blast survey shall be conducted by an independent engineering consulting firm qualified to inspect buildings; c. The inspector conducting the survey shall determine the condition of the building and shall document with scaled photographs and supplemental sketches any pre-blasting damage and other physical factors that could reasonably be affected by the blasting; d. Documentation shall include foundation and building construction details, other improvements and landscape features; e. Utilities such as pipelines, cables, transmission lines, and cisterns, wells, and other water systems warrant special attention; however, the assessment of these may be limited to surface conditions and other readily available data; f. The written report of the survey shall be signed by the person who conducted the survey; g. Copies of pre-blast inspection reports and any owner refusals shall be provided to the city, upon request. 2. Post-blast survey. a. A property owner that received a pre-blast survey may request a post-blast survey; b. The permittee is responsible for notifying the property owner of this right; c. The property owner must request this survey in writing to the permittee and a survey must be conducted within three business days following receipt of notification from the property owner; d. The post-blast survey, signed by the person conducting the survey, shall consist of scaled photographs of any alleged damages and a written report comparing the pre-blast photographs with the post-blast photographs; e. Copies of inspection reports or owner refusals shall be provided to the city upon request. D. Special inspections. Proximate blasting operations require special inspection. The owner of the property for which the permit is issued shall employ one or more independent special inspectors to provide inspections of all proximate blasting operations. The special inspector shall be from an agency qualified in blasting operations that has demonstrated competence to the satisfaction of the fire chief and the building and fire safety director. The fire chief and building and fire safety director may condition, suspend, or revoke the approval of any special inspector for any of the following grounds: 1. Failure to comply with the requirement or conditions of permit issuance; 2. Incompetence; 3. Conflict of interest; 4. Willful and negligent failure to inspect; 5. Failure to maintain certifications and licenses; 6. Failure to report non-compliances; 7. Violation of approved permit documents; or 8. Failure to perform any of the duties designated for special inspectors. Conditions, suspensions or revocations of special inspectors shall be for a period determined by the fire chief and the building and fire safety director. The special inspector shall develop a plan and inspection schedule to verify compliance with the approved plans. This plan and schedule shall be approved by the fire chief and building and fire safety director. The special inspector shall issue a stop work order when the approved blasting permit and accompanying documentation are not available on the job site at the time of inspection. The special inspector shall immediately notify the blasting contractor and shall maintain a copy of the stop work order on the blasting site. The special inspector shall immediately notify the contractor in writing of any blasting preparations or operations which is in non-conformance with the approved permit, blasting plan, or any provisions of this ordinance. Work shall not proceed unless the conditions noted in the non-conformance report have been corrected. The special inspector shall maintain a copy of the non-compliance report on the job site. The special inspector shall write daily report(s) and provide, as directed by the fire chief or the building and fire safety director or by the design professional or owner, such other information as may be required within the scope of the special inspector's duties. All daily reports prepared by a special inspector pursuant to these regulations are the property of the City of Henderson and shall be made available upon request of the fire chief or the building and fire safety director. The daily reports shall address conformance with the following: 9. Site maps and drawings; 10. Blasting plan; 11. Seismograph monitoring plan; 12. Traffic and access control plan; 13. Notification plan; 14. Other criteria as specified in these regulations. The special inspector shall immediately notify the contractor and the fire chief and building and fire safety director in writing of uncorrected non-conformance to the approved permits, blasting plan, or any provisions of these regulations within the scope of the special inspector. Notification shall be within 24 hours and may be by e-mail, fax, or telephone call. The special inspector shall submit a final report to the fire chief and building and fire safety director stating whether all required inspections were completed, documented, and found to be in compliance with the approved permit, blasting plan, and applicable provisions of these regulations. Final reports shall include all non-compliance reports with dates of corrective action approval and completed inspection history record. E. Exceptions. 1. The requirements of this section may be waived when the owner of the blast site and any building(s) within 300 feet are the same, and written permission is submitted on a form provided by the city. 2. The requirements of this section may be waived where written acknowledgement of all utility owner(s) within 300 feet has been submitted on a form provided by the city and there are no building(s) within 300 feet.

(Ord. 2416, §§ 3—4, 2005; Ord. 2388, § 3 (part), 2005)