§ 15.01.415 — Approved fabricators/manufacturers

Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 15.01.415

Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/2cfa8213-fa5d-4886-9992-e1f4311fe752

15.01.415 - Approved fabricators/manufacturers.

To perform work identified in this section, fabricators/manufacturers shall be approved by the building official who shall maintain a list of approved fabricators/manufacturers. Approved fabricator/manufacturer shall perform all duties imposed through this chapter, technical codes, and the technical guidelines. A. Approval required. Approval is required for the following fabricated/manufactured products and systems: 1. Engineered structural wood products; 2. Engineered structural metal products and assemblies; 3. Structural metal storage racks over eight feet in height; 4. Metal stairs, balconies, and assemblies; 5. Engineered metal canopies; 6. Amusement and transportation systems (ATS); 7. Pre-cast and/or pre-stressed concrete products; 8. Ready-mix concrete; 9. Exterior insulation and finish systems; 10. Panelized wall systems; 11. Other products or systems as the building official may designate. B. Requirements for approval. Each fabricator/manufacturer shall apply for approval using forms obtained from the building official and pay the fees as provided in this chapter. General approval requirements are listed below with additional detail provided in the technical guidelines: 1. Verification of the fabricator/manufacturer quality control capabilities, equipment and personnel as outline in the manufacture/fabrication procedural manual; 2. Periodic inspection of the fabricator/manufacturer shall be conducted to monitor the effectiveness of the quality control program; 3. Notify the building official in writing of any changes to the manufacture/fabrication procedural manual. An approved fabricator/manufacturer shall have an established written quality control program. The quality control program shall verify fabrication compliance with the technical codes and technical guidelines. The quality control program, through inspection and testing processes, shall provide documentation sufficient to meet the intent of the special inspection requirements of this chapter, the technical codes and the technical guidelines. C. Conditional approval. Conditional approval requirements are detailed in the technical guidelines. Conditional approval allows for the initial listing of a fabricator/manufacturer that has met minimum requirements equivalent to those contained in the technical guidelines. A conditional approval may also be provided for approved fabricators/manufacturers that require time to resolve findings identified and reported as part of the auditing process. D. Requirements for a one-time permit-specific approval. A fabricator/manufacturer requesting one-time permit-specific approval shall apply for approval using forms provided by the building official and pay the fees as provided in this chapter and chapter 15.02 of the Henderson Municipal Code. The fabricator/manufacturer shall be qualified as specified in the technical guidelines.

(Ord. 2736, § 1 (part), 2008)