§ 22.801.210 — "T"
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.801.210
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/2d0ef53a-081c-4dc3-a8a6-1279c9782412
22.801.210 - "T"
"Topsoil" means the weathered surface soil, including the organic layer, in which plants have most of their roots. "Trail" means a path of travel for recreation and/or transportation within a park, natural environment, or corridor. "Trail project" means a project for the creation of a new trail or replacement of an existing trail, and which does not contain pollution-generating hard surfaces. "Treatment facility" means a drainage control facility designed to remove pollutants from drainage water.
(Ord. 124872, § 26, 2015; Ord. 123105, § 2, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.
