Compliance monitoring.
San Antonio City Code § 34-477
in effectSec. 34-477. - Compliance monitoring.
(1) Monitoring facilities.
(a) Industrial users shall install and maintain monitoring facilities that allow inspection, surveillance and sampling at the discharge point and/or internal drainage systems located on private property. Permanent flow measurement, metering and/or totalizing devices for surcharge calculations and/or determination of the mass of pollutants discharged shall be required when deemed appropriate by the control authority. These facilities shall be provided by the industrial user and operated at the user's expense. All devices installed by an industrial user used to measure water and/or wastewater flow and quality shall be calibrated at a minimum of one (1) time per calendar year to ensure accuracy. The monitoring facility should normally be situated on the user's premises, but the control authority may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed on the sidewalk area and located so that it will not create a public safety hazard nor be obstructed by structures, landscaping, or parked vehicles. To establish water consumption of users on water wells, metering devices shall be installed, operated and maintained by the user.
(b) Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
(c) For multiple use buildings (i.e. shopping centers, medical service buildings, office buildings, etc.) having only one master water meter, or multiple meters paid by one person or company, and/or where the building is served by a common sewer lateral, one permit may be issued to the water bill addressee. In this case, the addressee shall be responsible for:
(1) The installation, operation, and maintenance of any required pretreatment device or monitoring station;
(2) Compliance with all provisions of this division and/or applicable pretreatment standards or requirements; and
(3) The payment of all sampling and analysis fees, surcharges, and any fines or penalties imposed. If in the judgment of the director, the quality of wastewaters from the separate users is such that separate pretreatment or monitoring facilities is appropriate, the director may require separate facilities. In this case, all of the aforementioned requirements shall apply to the individual users.
(d) There shall be adequate lighting of and ample room in or near such sampling manhole or facility to safely allow inspection personnel to position sampling, monitoring or surveillance equipment and prepare field samples for analysis. Whether construction on public or private property, the sampling and monitoring facilities shall be provided in accordance with the regional system requirements and all applicable local construction standards and specifications, including applicable requirements contained in the plumbing code, chapter 10 of the City Code, as amended or as may be amended.
(2) Inspection and sampling.
(a) The control authority and EPA and/or TCEQ representatives shall have the right to inspect the facilities of any industrial user to ascertain whether the purposes of this division are being met and all applicable requirements are being fulfilled. Industrial users and their employees shall allow authorized regulatory representatives displaying proper identification ready access to the premises at all reasonable times for the purpose of: inspecting wastewater generating operations and processes; wastewater flow monitoring and sampling; examination and reproduction of business records pertinent to water and wastewater volume and quality; including hazardous and non-hazardous waste manifests; inspection of potential slug-related discharges; and where applicable, making photographic documentation and obtaining other information necessary to ascertain and ensure that the correct data and information submitted in the facility's permit application, and assure and assess compliance by users with pretreatment standards and requirements. Inspection frequency is at a minimum conducted once per year, and the frequency will depend on the nature and type of industrial processes as is specified in the control authority's pretreatment program. Failure to allow access, to permit photographic documentation, or to allow copying of pertinent records will be considered a direct violation of this division.
(b) The control authority shall have the right to install, or require the installation of monitoring, testing, and surveillance equipment (including adequate lighting) and to take samples (including independent samples) of any indirect discharge at any reasonable time in accordance with the applicable provisions of this division. Where an industrial user has safety and/or security measures in force which require user issuance of special safety equipment and/or proper identification and clearance before allowing entry into their premises, the user shall make the necessary arrangements with their security guards or similar personnel, so that upon presentation of suitable identification, personnel from the control authority, the state, or EPA will be permitted to enter any or all areas of the user's facility, without delay, for the purpose of performing responsibilities reasonably associated with those stated above and reasonably required to accomplish the purposes and objectives of this division.
(c) Results of concentration and constituent analysis of wastewater from samples collected from any industrial user may be determined by the control authority or its authorized agent, the approval authority, a professional engineer contracted by the discharger, or by any other qualified party approved by the control authority.
(d) If the industrial user elects to contract with a professional engineer or other qualified party for sampling and analysis of wastewater, all results of such sampling and analysis shall be submitted to the director, and all reports submitted shall contain a statement certifying that the samples collected and values reported are developed in accordance with the collection and analytical procedures contained in section 34-474 of this division, 40 CFR 403.12, and the appropriate federal categorical pretreatment standards, as applicable. Each significant industrial user will be sampled at least twice each year, or more frequently if required by the local pretreatment program.
(e) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the control authority and shall not be replaced. The costs of clearing such access shall be borne by the user.
(3) Search warrants. Failure to allow access to a building, structure, or property, or any part thereof, when the control authority personnel is able to demonstrate probable cause to believe that there may be a violation of this division, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the control authority designed to verify compliance with this division or any permit or order issued hereunder, or to protect the overall public health, safety and welfare of the community, then the control authority may seek issuance of a search warrant from the municipal magistrate of the city or the County Judge of Bexar, or any judge of appropriate jurisdiction.
(Ord. No. 81771, § 2(App. I), 3-2-95; Ord. No. 85765, § 1, 3-20-97; Ord. No. 99480, § 1(Exh. 1), 7-22-04; Ord. No. 100030, § 1(Att. 1), 11-18-04; Ord. No. 2014-06-19-0472, § 1(Exh. A), 6-19-14; Ord. No. 2019-02-14-0123, § 1(Att. I), 2-14-19)
Source: City of San Antonio, City Code, City Charter and Unified Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/tx/san_antonio/codes/code_of_ordinances?nodeId=PTIICO_CH34WASE_ARTVSETRTRDI_DIV3INWA_S34-477COMOFetched: 10/27/2026
