For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1001.4 — Construction Operations and Start-Up Requirements

Baltimore City Code (current through Ord. 26-129 (July 17, 2026); publication of Oct. 18, 2026) · Baltimore City Code, Building Codes, Part XI, Section 1001.4

Corpus is an independent public-information project, not the official City of Baltimore website. Stable reference: corpuslaw.us/code/2d99f975-6788-4141-bc93-556ade541157

Section 1001.4. Construction Operations and Start-Up Requirements

1001.4.1 Erosion and Sedimation Control (ESC). {Not Adopted} 1001.4.2 IAQ Construction Management. Develop and implement an IAQ construction management plan to include the following: a. through c. {As in IgCC} b. PreK-12 schools and health-care projects. For preK-12 schools and health-care projects, after construction ends, prior to occupancy and with all interior finishes installed, a postconstruction, preoccupancy building flush-out, as described in § 1001.7.1, or a postconstruction, preoccupancy baseline IAQ monitoring, as described in § 1001.7.2, must be performed 1001.4.3 through 1001.4.5 {As in IgCC}

(Ord. 24-341 Section 1.)

Ask a question about Baltimore law

Corpus searches the Baltimore sections it holds and shows the ones that match, with their citations. Free, no sign-in.