§ 18.17.070 — Calculation of Transportation Improvement Fee
Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 18.17.070
Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/2e6fda68-4747-4c59-89f1-079564d80ed8
18.17.070 - Calculation of Transportation Improvement Fee.
A. The Director shall calculate the amount of the applicable Transportation Improvement Fee due as a condition precedent to the issuance of, and at any time prior to, the building permit based upon the applicable impact fee rate as specified in the fee-setting resolution. B. The Director shall calculate the amount of the applicable Transportation Improvement Fee due by: 1. Determining the number and type of dwelling units in a residential development and multiplying the same by the Transportation Improvement Fee amount per dwelling unit as established by the fee-setting resolution. 2. Determining the gross floor area, type of use and location in a nonresidential development, and multiplying the same by the Transportation Improvement Fee amount per square feet as established by the fee-setting resolution. 3. Determining the number and type of dwelling units in the residential development portion and the gross floor area, type of use and location in the nonresidential development portion of a building or structure containing mixed uses, and multiplying the same by the Transportation Improvement Fee amount as established by the fee-setting resolution for each use. 4. Determining the gross floor area, type of use and location in a building or structure containing mixed uses that include two (2) or more principal uses in the nonresidential development, and multiplying the same by the Transportation Improvement Fee amount as established by the fee-setting resolution for each use. The gross floor area of any accessory use will be charged at the same rate as the predominant principal use unless the Director finds that the accessory use is related to another principal use. C. The Director shall be responsible for determining the use type of the proposed development. If the Director determines that the proposed development is not in one of the use classifications included in the fee-setting resolution or, if the applicant submits relevant information and documentation acceptable to the Director demonstrating that the proposed development is not in one of the use classifications included in the fee-setting resolution or is a mixed use, the Director of Public Works shall: 1. Determine whether the proposed development has trip generation characteristics similar to a listed use classification; 2. If so, that use classification shall be used in calculating the appropriate Transportation Improvement Fee; 3. If not, identify the trip generation characteristics of the proposed development and, utilizing the ITE trip generation manual, assign the proposed use to the most similar land use type listed in the manual; 4. If there are no similar land use types listed in the ITE trip generation manual, the applicant may be requested to perform, at his or her own expense, a trip generation study or may utilize other statistically valid trip generation data applicable to the proposed use.
(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)
Ask a question about Long Beach law
Corpus searches the Long Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.
