§ 13.04.2015 — Outside City Planned Unit Developments (PUD)
Spokane Municipal Code; partial · SMC 13.04.2015 · Effective
Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/2eda64cb-c33b-45d8-8006-2978d663206e
Section 13.04.2015 Outside City Planned Unit Developments (PUD)
A. Basic Charge.
In general, a planned unit development (PUD) designation is one approved in accord with applicable PUD development standards and served by a master water meter. However, if a dwelling unit would otherwise be included within a PUD designation but has its own individual city water meter, it will be billed as a single-family residence under SMC 13.04.2012 or other applicable rate section. Questions of applicability are determined by the director. [Cross Reference: SMC 17A.020.160(T)]
B. Consumption.
For billing water consumption, the outside city PUD basic charge will be charged the same as a single-family residence outside the City limits except the PUD’s total consumption will be divided by the total number of dwelling units to determine the per-dwelling consumption for purposes of applying the rate steps defined in SMC 13.04.2012(B).
C. Size of Service / Meter Charge Per Month.  D. Capital Charge.
In addition to the basic charge and consumption charge, there shall be charged a capital charge for all accounts as established and provided for in SMC 13.035.500.
Date Passed: Monday, November 24, 2025 Effective Date: Wednesday, January 7, 2026 ORD C36811 Section 8
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.
