§ 31-401.4 — Accompanying data and reports
Salinas Municipal Code (Supp. No. 110, 9-26: codified through Ordinance No. 2696(NCS), passed June 16, 2026) · Salinas City Code § 31-401.4
Corpus is an independent public-information project, not the official City of Salinas website. Stable reference: corpuslaw.us/code/304768c1-6c93-4fe5-9d63-70128ae66cc4
Sec. 31-401.4. - Accompanying data and reports.
The tentative map shall be accompanied by the following data or reports: (a) Street names. A list of potential street names for any unnamed street or alley. The city planner shall submit the list to the street naming committee for comment and recommendations to be approved by city council in accordance with Article VIII of Section 30 of this Code. (b) Soils report. A preliminary soils report prepared in accordance with the city's grading standards shall be submitted to the city engineer. (1) The preliminary soil report shall be prepared by a civil geotechnical engineer who is registered by the state, and be based upon adequate test borings or excavations. The preliminary soil report may be waived if the city engineer determines that, due to the knowledge of the city as to the soil qualities of the subdivision, no preliminary analysis is necessary. The city engineer may require additional information or reject the report if it is found to be incomplete, inaccurate, or unsatisfactory. The report is required to provide analyses to address NPDES permit requirements. (2) The city engineer may require additional soils reports for the tentative map if the city engineer determines that additional soils information is required to evaluate the proposed design and improvement of the subdivision. (c) Title report. A preliminary title report, showing all parties with a legal or equitable interest and all easements, covenants, and other encumbrances and interests in the property at the time of filing the tentative map. (d) Engineering geology and/or seismic safety report. If the subdivision lies within a moderate or higher seismic hazard area, as shown in the, Seismic Hazard Zones of the General Plan Safety Element, a preliminary engineering geology and/or seismic safety report shall be prepared, unless waived by the city engineer. If said report indicates the presence of geologic hazards or seismic hazards, an engineering geology and/or seismic safety report specifying mitigation measures for each lot shall accompany the tentative map. (e) School site. The subdivider shall obtain from the school districts serving the subdivision their intention, in writing, concerning the necessity for a school site, if any, within the subdivision and shall present this information to the city planner prior to the consideration of the tentative map by the planning commission. (f) Environmental review information. The subdivider shall provide additional data, information, and reports, and deposit and pay fees as may be required to comply with CEQA and for the preparation and processing of environmental review documents, including but not limited to biotic reports and surveys, archaeological and paleontological studies, etc. as deemed necessary by the city planner or city engineer. (g) Hazardous materials and air pollution. For subdivisions that include nonresidential development, the subdivider shall provide information regarding hazardous materials and hazardous air emissions as required by Section 65850.2(b) of the Government Code. (h) Hazardous waste and substances statement. The subdivider shall submit a signed statement indicating whether the subdivision is located on a site that is included on a list compiled pursuant to Section 65962.5 of the Government Code and, if the project is included on such a list, specifying the list. (i) Common interest development projects. Any tentative map for a common interest development shall be accompanied by site plans and elevations showing the size, height, and location of all proposed buildings, driveways, parking, landscaping, open space, and walls, number of existing and proposed dwelling units, and other pertinent information in sufficient detail to determine the height and square footage of each structure and its conformance with existing plans, regulations, and ordinances; (j) Conceptual (preliminary) stormwater control plan. A conceptual stormwater control plan for NPDES compliance in accordance with the City's stormwater development standards. (k) Other reports. Any other data or reports deemed necessary by the city planner or city engineer. Subsections (a), (b), (d), and (e) of this section shall not apply to condominium conversions.
(Ord. No. 2585 (NCS), § 1, 12-13-2016)
Ask a question about Salinas law
Corpus searches the Salinas sections it holds and shows the ones that match, with their citations. Free, no sign-in.
