For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-142 — Backfill of excavated area

San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio City Code § 29-142

Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/30652b3d-f73a-40b8-897d-aa1cb2d99a11

Sec. 29-142. - Backfill of excavated area.

(a) Open trenches may be temporarily backfilled for the convenience of the permittee or the public safety. At least one (1) hour prior to beginning permanent backfill operations, the permittee shall notify the director of the time the backfill will begin. (b) All excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times, where excess water cannot be prevented from entering the trench, will be considered temporary and shall be removed as soon as weather permits. All disturbed base material or any base that has been undermined shall be removed and discarded. The new roadway base material shall be a minimum depth of six (6) inches asphalt treated base or other approved roadway base material, as detailed in the UECM.

(Ord. No. 93319, § 1, 1-25-01)

Ask a question about San Antonio law

Corpus searches the San Antonio sections it holds and shows the ones that match, with their citations. Free, no sign-in.