§ 15-13-42 — MONITORING AND SAMPLING
Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 15-13-42
Corpus is an independent public-information project, not the official City of Austin website. Stable reference: corpuslaw.us/code/30e61bb4-036e-4069-adb6-7363424e7503
§ 15-13-42 - MONITORING AND SAMPLING.
(A) A treatment system manager must perform all water quality sampling required by Table 5 and the annual permit. (B) A permittee violates this section if someone other than the treatment system manager performs water quality sampling required by this section. (C) A treatment system manager shall collect water samples in a manner that complies with U.S. EPA Wastewater Standard Methods for the Examination of Water and Wastewater Method 9060B. (D) A water sample required by this section must be analyzed: (1) in a certified laboratory that uses the methods described in Table 3; or (2) through an approved in-line monitoring devices that is as detailed in the approved engineering report. (E) A treatment system manager shall collect and transport each sample in a manner that meets quality assurance and quality control (QA/QC) standards of the labs, including maintenance of required hold times and temperatures. (F) To measure total coliform, BOD or TSS, a water sample must be collected from disinfected effluent. (G) To measure chlorine residual, a water sample must be collected at or after entry to the plumbing of the distribution system. (H) The director may request to be present during required water quality sample collections or require that the permittee use a third-party who is not the treatment system manager to take water quality sample collections. (I) A project applicant shall install instrumentation with continuous monitoring capabilities. (J) If a pathogen LRT or total coliform exceeds the limits in Tables 1 and 2, the permittee shall notify the director in accordance with Section 15-13-45 (Malfunction Notification). Table 5: Water Quality Sampling Requirements Parameter | Rain/Condensate | Stormwater/Foundation Drain | Graywater Conditional | Operating | Conditional | Operating | Conditional | Operating Total Coliform 1 | Weekly for Rainwater | Monthly | Weekly | Monthly | Weekly | Monthly Chlorine Residual | Continuously at entry to end-use plumbing LRTs | Continuously as specified in the approved engineering report BOD 5 | N/A | N/A | N/A | N/A | Weekly | Monthly TSS | N/A | N/A | N/A | N/A | Weekly | Monthly Flow | Continuously measuring alternative water treated by the OWRS 1 Total coliform monitoring requirement may be eliminated after 12 consecutive months of consistent compliance.
Source: Ord. No. 20201210-006, Pt. 2, 12-21-20.
Ask a question about Austin law
Corpus searches the Austin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
