§ 82-91 — Location and traffic control
Code of the City of Clinton, Mississippi (Supp. No. 4: codified through Ordinance of December 4, 2018 (stale; online content updated December 11, 2019)) · Clinton Code of Ordinances § 82-91
Corpus is an independent public-information project, not the official City of Clinton website. Stable reference: corpuslaw.us/code/31cfdb86-fac1-48f2-8c18-2cae0380e00d
Sec. 82-91. - Location and traffic control.
(a) Utility lines shall be located in such manner as to minimize the need for later adjustments, to accommodate future highway improvements and to permit access for servicing such lines with minimum interference to highway traffic. (b) Longitudinal installations shall be located on reasonably uniform alignment and as near as practical to the right-of-way line so as to provide a safe environment for a traffic operation and to preserve space for future highway improvements or other utility installations. (c) Utility line crossings of the highway shall cross on a line generally perpendicular to highway alignment to the maximum practical extent. (d) The proposed horizontal and vertical dimensions and clearances for the various types of utilities must be clearly shown on the plans or stated in the agreement between the City of Clinton and the utility. (e) Utility lines shall be installed within the rights-of-way in such manner and at such locations as will provide the maximum roadside clearance from the edge of the traveled way. Normally the installations will be at or near the backside of the right-of-way and shall be minimum of 30 feet from the edge of the traveled way where the right-of-way width and typical cross section will permit. (f) No part of the utility (fire hydrants, valve boxes, poles, etc.) shall be placed in the right-of-way, which adversely affect the maintenance and function of the roadway, shoulders, ditches, or back slopes. (g) All trenches and disturbed areas of construction shall be backfilled and thoroughly tamped in lifts not to exceed six inches. Disturbed areas of construction will be dressed and resodded to restore the area to original condition of natural growth. When buried utilities are located less than five feet outside of the shoulder of the roadway the utility must provide certified compaction reports that confirm that a trench compaction of 95 percent standard proctor density has been achieved or must install flowable fill as directed by the engineer or public works director. (h) At no time shall the utility or it agents place any material in the roadway. In addition, the utility shall take the appropriate measures to protect the roadway from any damage or contamination during its operations. (i) Existing city facilities (traffic control devices, riprap, culverts, geotextiles, roadways, shoulders, ditches, etc.) shall not be removed, relocated, disturbed, or damaged, by the utility without prior written permission. In the event traffic control devices are compromised in any way, the public works director shall be notified immediately in order to protect the traveling public. In those cases where city facilities are compromised by the utility or its agents, the city may at its discretion perform the necessary repairs and replacements and bill the utility for personnel and equipment time, material cost, and administrative fees. (j) Control of traffic: Traffic controls for utility construction and maintenance operations should conform with the latest edition of the Manual on Uniform Traffic Control Devices for streets and highways. All construction and maintenance operations should be planned with full regard to safety and to keep traffic interference to an absolute minimum. Prior to performing any maintenance or construction work in the right-of-way the utility shall certify by letter that they will adhere to the guidelines of the latest edition of the Manual on Uniform Traffic Control Devices for streets and highways. (k) Servicing, maintenance and repairs: All utility facilities shall be kept in a good state of repair both structurally and from a standpoint of appearance. The utility use and occupancy agreement shall identify maintenance operations, which are permitted and indicate situations where prior notification to the city is required. (l) Utilities will be required to place on deposit with the city funds sufficient to reasonably repair the damage their work could cause. The engineer, or representative, shall be responsible for determining the amount of funds to be placed on deposit and shall make this recommendation to the city as part of the permit application approval process. Those utilities, which are based in the city and/or have a continual significant business office in operation in the city, may request that this requirement be waived. In the event that the utility does not perform work necessary to restore the city right-of-way in a proper and timely manner the city may perform the work and bill the utility personnel and equipment time, materials and administration fees, necessary to properly restore the site. The required deposit shall be retained by the city until the statement rendered for such force account work is paid in full. If the statement for such work is not paid in full within 30 days' receipt thereof, the full deposit shall be forfeited to the city. Further, failure to perform the work necessary to restore the city right-of-way in a proper and timely manner may result in unfavorable consideration of future permit requests by the utility. (m) The utility must maintain a complete copy of the approved permit on site while any work is being performed. Any violation or nonconformance with the city policy for the accommodation of facilities within the rights-of-way of all public city roads may result in the voiding of the permit at which time the utility will be responsible for ceasing its construction efforts and returning the affected areas to a safe and functional condition. (n) The utility shall warrant its work for a period of not less than one year from day of completion as documented by the utility in letterform to the engineer. On projects of a significant nature, as determined by the engineer, a certificate from a licensed professional engineer stating that the work is complete and is in accordance with the approve permit and plans will be required. (o) Any utility or individual performing work within the city right-of-way limits without the proper city permit having been acquired or without the city permit number on site will be subject to a fine of not less that $500.00 and not more than $5,000.00. Any utility or individual violating this policy in any way will be subject to a fine of not less than $500.00 and not more than $5,000.00.
(Ord. of 05-15-2007(2) )
Ask a question about Clinton law
Corpus searches the Clinton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
