§ 34-805 — Additional federal and state requirements generally applicable to responsible parties associated with TPDES Regulated Projects: proper custody of federal or state storm water pollution prevention plans (SWPPP); applicable to parties required to provide TPDES notice of intent (NOI) or Small Construction Site Notice (CSN) to EPA or TCEQ and San Antonio Water System (SAWS); requirement to post TPDES Notices at site; requirement to make SWPPP available to city inspector; copy of Notice of Termination (NOT) or small construction site or large construction site secondary operator completed site notices required by TCEQ or SAWS

San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio City Code § 34-805

Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/32950e8f-43fc-444c-a8d7-f37b25e71b0e

Sec. 34-805. - Additional federal and state requirements generally applicable to responsible parties associated with TPDES Regulated Projects: proper custody of federal or state storm water pollution prevention plans (SWPPP); applicable to parties required to provide TPDES notice of intent (NOI) or Small Construction Site Notice (CSN) to EPA or TCEQ and San Antonio Water System (SAWS); requirement to post TPDES Notices at site; requirement to make SWPPP available to city inspector; copy of Notice of Termination (NOT) or small construction site or large construction site secondary operator completed site notices required by TCEQ or SAWS.

(a) Concerning projects for which the EPA or TCEQ or the City have permitting authority, the responsible party shall post at the site, as required by federal or state regulations, a true and correct copy of the NOI, Permit Number, large construction site notice or small construction site notice. A copy of the NOI, Permit number, large construction site notice or small construction site notice and the WPAP Notice of construction shall also be sent to SAWS resource protection and compliance department at the same time it is sent to EPA or TCEQ when applicable. (b) The responsible party shall have available for city inspection, on site, the storm water pollution prevention plan (SWPPP) imposed by EPA or TCEQ, when the site in question is subject to such plans imposed by federal or state law. (c) The responsible party shall make the SWPPP available to the city inspector, on reasonable request made during normal working hours. (d) Failure, refusal, or inability to provide such plan for inspection, when the plan is required under state or federal law, constitutes a violation of this subdivision. (e) It shall be unlawful for any person to engage in construction activity in violation of the elements of an applicable SWPPP and applicable WPAP. (f) The responsible party shall provide SAWS a true and correct copy of any notice of termination (NOT), small construction site completed site notice or large construction site secondary operator completed site notice necessary to close out a project regulated by EPA or TCEQ. This copy shall be sent to SAWS, to the attention of SAWS resource protection and compliance department, at the time it is sent to EPA or TCEQ. (g) Where permanent improvements have been constructed, the final inspection shall verify whether or not the "final stabilization" criteria have been met. (h) Where no permanent improvements are planned, temporary BMPs shall continue to be maintained until site has reached final stabilization. (i) A site shall continue to be regulated and maintain an open, active permit until final stabilization is achieved; and, where applicable to state and federally regulated sites, until a "notice of termination" (NOT) or small construction site completed site notice or large construction site secondary operator completed site notice has been filed. A copy of the NOT, if applicable, will also be filed with the SAWS as described above at subsection (t). (k) Where the site has met final stabilization requirements, but the controls or measures implemented thereafter fail, each discharge of construction related contamination by the responsible party shall constitute a violation of this subdivision B. (l) Removal of temporary BMPs shall be required after the site achieves final stabilization. (m) The responsible party shall have available for City inspection on the construction site, a true copy of an approved master plan of development. (n) The responsible party shall have available on the construction site the water pollution abatement plan (WPAP) and WPAP approval notice imposed by TCEQ when the site in question is subject to such plans required by TCEQ in 30 Texas Administrative Code, Chapter 213. (o) The responsible party shall have available for city inspection all records and documents required by the EPA or TCEQ SWPPP and TCEQ WPAP (as applicable). (p) All SWPPP documents shall be designed and signed by a licensed professional engineer (Texas) with competence in this area as required by Texas Engineering Practice Act, Section 137, or a Certified Professional in Erosion and Sedimentation Control (CPESC). (q) To assure continued effective compliance with best management practice methodology on the construction/development site, an engineer or CPESC, Certified Erosion, Sediment and Storm Water Inspector (CESSWI) or Certified Inspector of Sediment and Erosion Control (CISEC) shall conduct ongoing inspections of all erosion/sedimentation controls and direct the person or firm responsible for maintenance to make any repairs or modifications necessary within forty-eight (48) hours of the initial notification.

(Ord. No. 94002, § 1, 5-24-01; Ord. No. 2014-06-19-0472, § 1(Exh. A), 6-19-14; Ord. No. 2019-02-14-0123, § 1(Att. I), 2-14-19)