For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-66 — Sewer utility industrial rates

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 19-66

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/33931a7f-819e-4f0b-8891-08aefe7c9c78

Sec. 19-66. Sewer utility industrial rates.

a. Calculation based on water used. The City sewer utility industrial rate is calculated by adding the minimum bill which is based on the size of water meter, plus the volume of water used, plus a surcharge calculated for any extra strength waste discharged into the system. TABLE (A1) MINIMUM MONLTHLY INDUSTRIAL RATES -Effective 10-1-2026 Monthly Minimum Meter Size (in.) | Inside City | Outside City 5/8 | 84.00 | 126.00 1 | 84.00 | 126.00 1 1/2 | 84.00 | 126.00 2 | 84.00 | 126.00 3 | 84.00 | 126.00 4 | 119.10 | 178.65 6 | 219.30 | 328.95 8 | 335.40 | 503.10 10 | 481.80 | 722.70 12 | 828.60 | 1,242.90 (Ord 0-2003-42, 9-10-2003) (0-2005-77,9-28-2005) (0-2006-79; 9-13-2006) (0-2008-128; 9/24/08) (Ord. 0-2009-103; 9/23/09) (Ord. No. 0-2010-99, 9/22/10) (Ord. 0-2012-69, 9/12/12) (Ord. No. 0-2013-90; 9/25/13) (Ord. No. 0-2014-86; 9/24/14) (Ord. No. 0-2015-91; 9/22/15) (Ord. No. O-2016-78; 9/14/2016) (Ord. No. 0-2017-77; 9/13/17) (Ord. No. 0-2018-69; 9/12/18) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2020-85; 9/9/20)(Ord. No. 0-2022-87; 9/14/2022)(Ord. No. 0-2023-85;9/13/23) (Ord. No. 0-2024-85; 9/11/24) (Ord. No. 0-2026-48; 9/9/26) TABLE (A2) VOLUME CHARGE FOR WATER USED¹ (per 1,000 gallons): Volume Charge – Inside City (per 1k gal) Volume | October 1, 2026 First 2k | 3.48 Next 998k | 3.48 Next 4mil | 3.12 Over 5mil | 3.12 Volume Charge – Outside City (per 1k gal) Volume | October 1, 2026 First 2k | 5.22 Next 998k | 5.22 Next 4mil | 4.68 Over 5mil | 4.68 SURCHARGE FOR EXTRA STRENGTH DISCHARGEBased on water used at $ per mg/1 per 1,000 gallons | October 1, 2022 BOD5 | 0.002660663 COD | 0.001286306 TSS | 0.001491758 (Ord 0-2003-42, 9-10-2003) (Ord. 0-2005-77, 9-28-2005) (0-2006-79; 9-13-2006) (0-2008-128; 9/24/08) (Ord. 0-2009-103; 9/23/09) (Ord. No. 0-2010-99, 9/22/10) (Ord. 0-2012-69, 9/12/12) (Ord. No. 0-2013-90; 9/25/13) (Ord. No. 0-2014-86; 9/24/14) (Ord. No. O-2016-78; 9/14/2016) (Ord. No. 0-2017-77; 9/13/17) (Ord. No. 0-2018-69; 9/12/18) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2020-85; 9/9/20) (Ord. No. 0-2021-37; 4/28/21)(Ord. No. 0-2022-87; 9/14/2022)(Ord. No. 0-2023-85;9/13/23)(Ord. No. 0-2024-85; 9/11/24) (Ord. No. 0-2026-48; 9/9/26) b. Calculation based on sewage disposal. The City sewer utility industrial rate is calculated by adding the minimum bill which is based on the size of the water meter [see TABLE (A1) above, plus the volume of sewage discharged over the minimum, plus a surcharge calculated for any extra strength waste discharged into the system. TABLE A3 VOLUME CHARGE FOR SEWAGE DISCHARGED² (PER 1,000 GALLONS) October 1, 2026 Gallons | Inside City | Outside City First 2,000 | 3.48 | 5.22 Next 998,000 | 3.48 | 5.22 Next 4,000,000 | 3.12 | 4.68 Over 5,000,000 | 3.12 | 4.68 SURCHARGE FOR EXTRA STRENGTH DISCHARGEBased on sewage discharged $ per mg//1 per 1,000 gallons | October 1, 2022 BOD5 | 0.003927484 COD | 0.001838857 TSS | 0.002132359 (Ord 0-2003-42, 9-10-2003) (Ord. 0-2005-77, 9-28-2005) (0-2006-79; 9-13-2006) (0-2008-128; 9/24/08) (Ord. 0-2009-103; 9/23/09) (Ord. No. 0-2010-99, 9/22/10) (Ord. 0-2012-69, 9/12/12) (Ord. No. 0-2013-90; 9/25/13) (Ord. No. 0-2014-86; 9/24/14) (Ord. No. O-2016-78; 9/14/2016) (Ord. No. 0-2017-77; 9/13/17) (Ord. No. 0-2018-69; 9/12/18) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2020-85; 9/9/20) (Ord. No. 0-2021-37; 4/28/21)(Ord. No. 0-2022-87; 9/14/2022)(Ord. No. 0-2023-85;9/13/23) (Ord. No. 0-2024-85; 9/11/24) (Ord. No. 0-2026-48; 9/9/26) c. If an industrial user is not connected to the city water system, the minimum charge will be calculated on water system size. The rates charged will be equivalent to the rates charged for metered systems of the same size. d. If any of the concentrations set forth in the industrial waste ordinance are exceeded, such as, but not limited to chemical oxygen demand (COD) and total suspended solids (TSS), the industrial customer will pay a surcharge in accordance with the preceding extra strength surcharge rates, or as transportation and/or treatment costs may warrant for any other pollutants. Only in exceptional cases will pollutants in excess of permitted parameters be accepted. e. Industrial rates (I.R.) can thus be calculated by either of two (2) equations: 1. Volume of water used (under 1,000,000 gallons based on a seventy (70) percent return factor): I.R. = Mw + (Rate per 1,000 gals.) (Vw - 2) + [(COD Surcharge)(COD-300) + (TSS Surcharge) (TSS-250)] Vw 2. Volume of sewage discharged (under 1,000,000 gallons): I.R. = Ms + (Rate per 1,000 gals.)(Vs-2) + [(COD Surcharge)(COD-300) + (TSS Surcharge) (TSS-250]Vs where: Mw = The minimum rate for sewer utility use based on the size of water meter. Ms = The minimum rate for sewer utility use based on the size of water meter, or on the water meter size equivalent. Vw = The total volume of water used during the month (in thousands of gallons). Vs = The total volume of sewage discharged during the month (in thousands of gallons). COD = The established chemical oxygen demand strength of the industrial waste discharged, based on laboratory analyses, and expressed in milligrams per liter (mg/l). TSS = The established total suspended solids concentration of the industrial waste discharged, based on laboratory analyses, and expressed in milligrams per liter (mg/l). 250 = The surcharge limit for TSS established in the industrial waste ordinance, expressed in milligrams per liter (mg/l). 300 = The surcharge limit for COD established in the industrial waste ordinance, expressed in milligrams per liter (mg/l). f. Rates for services to industrial waste dischargers outside the city limits shall be multiplied by a factor of 1.5. (Ord. No. O-96-54, 6-26-96) (Ord. No. 0-98-74, 9/2/98) (Ord. No. 0-99- 70, 10-1-99) (Ord. No. 0-2022-87; 9/14/2022) (Ord. No. 0-2024-85; 9/11/24) (Ord. No. 0-2026-48; 9/9/26)

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.