§ 2.245 — Stormwater Drainage System Design Criteria
Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 2.245
Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/33fa2ad4-200f-46c5-9cf0-81d897a0b249
Sec. 2.245. - Stormwater Drainage System Design Criteria.
(1) Design Storms. The following design storm standards require that the design engineer confirm the adequacy of the downstream system capacity and the existence of an acceptable emergency overland flow-way. Type of Facility | Design Storm Open Channel Roadside swales, ditches | 10 year Temporary construction channel | 5 year Emergency overland flow-way | 100 year Enclosed Channels (Storm drain pipes and culverts) Collector systems | 10 year Trunk systems | 25—100 year Detention/Retention Facilities Emergency overflow spillway capacity | 10 year Flood Control Design Storm Outside sensitive sewer sheds listed in Stormwater Standards Manual, Appendix 2 | 25 year Inside sensitive sewer sheds listed in Stormwater Standards Manual, Appendix 2 | 100 year Water Quality Volume (WQV) | Runoff from 1.0 inch rainfall event* Channel protection | 2 year * Per MDEQ memo dated March 24, 2006, ninety (90) percent non-exceedance rainfall event for Grand Rapids is approximately one (1) inch. (2) Standard Design Storm Data. (a) Standard rainfall intensities for design storms used in the Rational Method, the Modified Chicago Method or similar methods are contained in Stormwater Standards Manual. (b) A Detention Storage Graph is provided in Stormwater Standards Manual. (c) The Natural Resources Conservation Service formerly known as Soil Conservation Service (SCS) Type II Rainfall Distribution for the total volume for a twenty-four-hour duration rain event shall be used as the standard hydrograph in modeling a stormwater drainage system's performance. Stormwater Standards Manual provides the standard data to be used for various return frequency rain events. (3) Guidelines for Management Practices. The design and construction of: drainage; soil erosion and sediment control; and post-construction stormwater management facilities shall be based upon the standards contained in the MDEQ-SWQ Guidebook of Best Management Practices for Michigan Watersheds (GBMP), October 1998, as revised, the Kent County Drain Commissioner's Subdivision Drainage Rules, as revised, The City of Grand Rapids City Code, The City of Grand Rapids Standard Construction Specifications, City of Grand Rapids Stormwater Standards Manual (latest edition), this Ordinance, and/or project contract documents. (4) Site Specific Requirements. (a) Pretreatment: Pretreatment of site runoff is required on a site-specific basis prior to discharging to certain stormwater BMPs. Pretreatment provides for the removal of fine sediment, trash and debris, and preserves the longevity and function of the BMP. (b) Hot Spots and Groundwater Contamination: Some land use activities have a potentially greater risk of polluted runoff than others. Project sites with these types of activities are referred to as "hot spots" as defined in Table 2 - Stormwater Hotspots in Stormwater Standards Manual. Hot spots also include areas with the potential for contaminating public water supply intakes and wells. Pretreatment of stormwater runoff to address pollutants associated with hot spots is required for the site. Stormwater management strategies and BMPs that reduce the potential to mobilize existing soil and groundwater contaminants, or that capture and treat stormwater runoff and/or accidental spills to protect groundwater or nearby surface waters are required per Part 3, Section E, Stormwater Standards Manual. (c) Coldwater Streams: Stormwater management strategies and BMPs that minimize thermal impacts from site runoff and maximize groundwater recharge are required for sites with a surface water discharge to a coldwater stream listed in Appendix 2 of Stormwater Standards Manual. (5) Runoff Reduction. Site plans shall be designed to minimize increased runoff from the proposed development by preserving floodplains and wetland areas, minimizing impervious surfaces, conveying flows in open vegetated swales, infiltrating runoff into the ground and on-site storage for irrigation purposes. (6) Discharge Volume and Rate Limits: (a) Channel Protection: 1. For all sites: Maintain the post-development project site runoff volume and peak flow rate at or below pre-development levels for all storms up to the two (2) year, twenty-four (24) hour event. Onsite retention of the runoff volume increase is required. 2. Where documentation meeting the requirements of the Stormwater Standards Manual indicate infiltration and site constraints, an alternative approach may be allowed after maximizing on-site design and retention options. a. The alternative approach shall consist of extended detention of the two-year, twenty-four-hour storm for a period of twenty-four (24) hours resulting in a drawdown time no greater than seventy-two (72) hours. The resulting peak discharge shall be no greater than the existing one-year peak discharge. b. At the sole discretion of the City, off-site mitigation; payment-in-lieu; the Alternative approach in subsection (1), above; or a combination may be considered. 3. For sites discharging stormwater runoff into a drainage system, which includes sensitive downstream open channels as listed in Appendix 2 of the Stormwater Standards Manual that are susceptible to stream bank erosion: the peak flow rate shall be the lesser of pre-development levels or 0.05 cubic feet per second per acre up to the two (2) year rain event. (b) Flood Control: 1. Two (2) Acres or Larger. Developments and redevelopments, two (2) acres or larger shall have a maximum discharge rate of 0.13 cubic feet per second per acre for the event specified in Section 2.245(1). 2. Less Than Two (2) Acres. Developments and redevelopments, less than two (2) acres shall restrict discharge to the greatest extent feasible by using filtration basins or similar devices or means, provided the discharge rate does not exceed 0.26 cubic feet per second for the event specified in Section 2.245(1). (7) Access to Drainage Structures. Surface drainage structures must be accessible for maintenance. An access route must be provided which shall be at least twelve (12) foot wide, no steeper than a five (5) percent grade and capable of supporting a five (5) ton truck. (8) Pipe/Culvert Inlet and Outlet Bar Screens. The inlet or outlet to any pipe or culvert, which is greater than twelve (12) inches in diameter, shall be equipped with a bar screen or "critter grate". All inlet bar screens shall be designed to avoid trapping a person against the screen. Driveway culverts less than fifteen (15) feet in length are exempt from this requirement. (9) Leaching or Infiltration Basins and Systems. (a) Basic Soil Requirements. 1. Leaching basins may be used only in pervious soils with design infiltration rates exceeding 0.24 inches per hour per Table 5, Stormwater Standards Manual. 2. A test pit or soil boring per Stormwater Standards Manual shall be the basis for determining acceptability of soil type. 3. Where field permeability testing is conducted, the measured rate shall be divided by a factor of 2 to calculate the design infiltration capacity. The design infiltration capacity shall not exceed 3.6 inches per hour. (b) Determination of Number—Application of Basic Method. 1. Soil type is suitable as determined by soil boring or test pit per Stormwater Standards Manual. 2. A minimum three (3) foot separation shall be provided between the bottom of the practice and the high groundwater table. 3. Without further calculation, one (1) standard leaching basin accommodates five thousand (5,000) square feet of impervious area (parking lot, building roof). (c) Standard Detail of Construction. 1. Standard leaching basin detail may be obtained from the ESD. (d) Location. 1. The filter fabric/sand interface of a leaching basin must be a minimum of ten (10) feet from the nearest property line. 2. Minimum distance between basins shall be fifteen (15) feet, measured from the filter fabric/sand interface. (e) Interconnections. 1. All basins must interconnect by means of a storm drainpipe. 2. A connection can be made to the CSDS provided the invert is above the side well leaching area. (10) Stormwater Detention/Retention Facilities. (a) Outfalls. Stormwater outfalls from detention or retention facilities shall discharge to a defined downstream system with adequate capacity to handle the flow. When discharging to an open channel, an energy dissipater and/or other soil erosion protection must be provided. (b) Freeboard. A minimum freeboard of one (1) foot above the design high water elevation shall be provided. (c) Minimum Pipe Size. Single pipe outlets shall have a minimum inside pipe diameter of three (3) inches. When the design release rates call for more restrictive flows than can be achieved by a three (3) inch pipe, an alternate design must be provided to achieve the desired restriction. Alternate designs may include structures such as perforated risers, restrictive orifices with debris control baffles, or some other facility such as a filtration basin. (d) Buffer Zones. Residential structures shall be constructed at least fifty (50) feet away from the design high water elevation of a detention basin, or twenty (20) feet from a floodway or areas subject to a base flood. (e) Sediment and Debris Removal. Drainage facilities designed for the settling of suspended materials and the skimming of floating materials shall be provided with adequate vehicular access to permit normal maintenance activities. The access shall be designed and constructed in accordance with Section 2.245(6) "Access To Drainage Structures." Appropriate easements shall be granted over the access route. (f) Dewatering of Detention Facilities. The bottom of a detention basin shall have at least a two (2) percent slope toward the outlet or be equipped with an adequate underdrain system to dewater the basin within twenty-four (24) hours after a rain event has ended. (g) Safety. Consideration shall be given to the protection of the general public in the design of stormwater detention or retention facility. The design shall identify public safety concerns relevant to the proposed facility. Slope conditions, enclosures, screening or other measures shall be incorporated into the design of such facilities to reasonably minimize potential hazards to the public. Enclosures shall be provided and maintained in accordance with Section 421.0 "Swimming Pools" and particularly Subsections 421.1 "General", 421.9 "Enclosures for Public Swimming Pools", and 421.10 "Enclosures for Private Swimming Pools, Spas and Hot Tubs" of the National BOCA Code, as revised. 1. Detention or retention facilities that exceed two (2) feet in depth shall be constructed with side slopes not to exceed twenty-five (25) percent in grade unless the slope is existing. 2. Detention facilities shall be provided with a permanent enclosure (fence) when its side slopes exceed seventeen (17) percent grade, or the average depth exceeds three (3) feet. The average depth is determined by the maximum design volume divided by the water surface area of the basin at the design high water elevation. 3. Retention facilities which have maximum depths exceeding two (2) feet shall either be enclosed or shall be surrounded by a dense wetland type vegetative barrier which is a minimum of twenty (20) feet wide and the water depth within the barrier does not exceed two (2) feet. 4. The above slope parameters apply strictly to slopes that are created with the construction of the detention or retention facility. Proposed facilities with existing slopes with a well established vegetative cover shall be evaluated for the need of an enclosure or barrier on a site specific basis. (11) Emergency Overflow Flow-Way. Whenever a stormwater facility, including all storage and conveyance features, is constructed for a design storm less than the one hundred (100) year storm, an emergency overland flow-way and easements shall be provided to convey or store that portion of the one hundred (100) year runoff which the facility does not manage. Any easements are to be on a form approved by the City Attorney and recorded with the Kent County Register of Deeds. (12) Stormwater Conveyance Systems. (a) Connections. 1. Stormwater discharges shall not be directed into a sanitary sewer. Exceptions may be granted by the ESD for developments located within a combined sewer area, once all other alternatives for managing the stormwater have been exhausted. 2. Where stormwater will be discharged to the City Combined Sewer System, storm and sanitary shall remain separate within the project boundary and be combined at the last structure prior to connection to the City main, where feasible as determined by the City Manager. 3. Roof drains, which are to be connected to the public underground drainage system, shall pass through a pressure relief structure or catch basin before connecting to the public drainage system. (13) Storm Drain Pipes. (a) Pipe Size. A minimum pipe diameter of twelve (12) inches is standard for public systems and three (3) inches for private systems. (b) Slopes and Hydraulic Gradient. The standard recommended minimum slope for storm drains shall produce a velocity of two and one-half (2.5) feet per second when the storm drain is flowing full. For pipe less than eighteen (18) inches in diameter, the minimum grade shall be one-half (0.5) of one (1) percent. (c) Spacing of Manhole Structures. Manhole spacing shall not exceed three hundred fifty (350) feet for pipes less than or equal to seventy-two (72) inches in diameter and shall not exceed seven hundred (700) feet for those greater than seventy-two (72) inches. (d) Minimum Clearances for Storm Sewer Pipe Shall Comply With the Following Criteria: 1. Road Base. A minimum of one (1) foot is required between the bottom of the road base material and the outside crown of the storm drain. 2. Utility Conflicts. For utility conflicts that involve crossing a storm drain, the minimum design clearance between the outside of the pipe and the outside of any conflicting utility shall be 0.5 foot. 3. Utility Placement. Storm drain systems shall not be placed parallel to and below existing utilities, which could cause utility support problems. The recommended clearance is two (2) feet extending from each side of the storm drain and one (1) on one (1) side slopes from the trench bottom. 4. Manholes. Utility lines shall not, as a rule, pass through any manhole or pipe. The utility line (e.g., gas, water, electrical conduit, etc.) shall be offset in such a way as to provide adequate clearance between the crossing. When a sanitary line or other utility must pass through a manhole, the greatest possible clearance from the bottom of the flow channel shall be provided with a minimum of one (1) foot clearance. When utilities are run through a manhole, they shall be installed in such manner as to avoid impeding maintenance access. (14) Open Channels. (a) Natural stream and channel systems shall be preserved. (b) Streams and channels shall be designed and constructed to avoid streambank erosion in accordance with the guidance provided in the GBMP. (c) Manning's "n" Values For Constructed Open Channels can be found in Stormwater Standards Manual. (d) Channel side slopes shall be stable throughout the length. (e) "V" or Triangular shaped channels are not allowed. (f) The design of artificial open channels shall be consistent with the velocity limitations found in the GBMP for various "Runoff Conveyance and Outlets". (g) Channel slopes shall be stabilized against erosion by either adequate vegetation or protective armoring.
(Ord. No. 2022-20, § 1, 7-26-22)
Ask a question about Grand Rapids law
Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.