For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.801.190 — "R"

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.801.190

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/345ae1ae-2615-423b-ac2e-a0abc660430c

22.801.190 - "R"

"Real property" means "real property" as defined in Chapter 3.110. "Receiving water" means the surface water, such as a creek, stream, river, lake, wetland or marine water, or groundwater, receiving drainage water. Drainage systems and public combined sewers are not receiving waters. "Repeat violation" means a prior violation of this subtitle within the preceding five years that became a final order or decision of the Director or a court. The violation does not need to be the same nor occur on one site to be considered repeat. "Replaced hard surface" or "replacement of hard surface" means: 1. For structures, the removal of the structure down to (i.e., exposing the top of) the foundation without removing the foundation and replacement of the structure; and 2. For other hard surfaces, the removal of the surface down to the existing base course or exposing the top of the subgrade and replacement, including repair of the base course layer. If, for a structure, the existing foundation is removed or, for any other hard surface, the subgrade or base course grade elevation is modified beyond what is required to repair the existing hard surface or base course, then the structure or other hard surface is a new hard surface. "Responsible party" means all of the following persons: 1. Owners, operators, and occupants of property; and 2. Any person causing or contributing to a violation of the provisions of this subtitle. "Right-of-way" means "right-of-way" as defined in Section 23.84A.032. "Roadway" means "roadway" as defined in Section 23.84A.032. "Roadway project" means a project located in the public right-of-way that involves the creation of a new or replacement of an existing roadway or alley. The boundary of the public right-of-way shall form the boundary between the parcel and roadway portions of a project. "Runoff" means the portion of rainfall or other precipitation that becomes surface flow and interflow.

(Ord. 127444, § 2, 2026; Ord. 126336, § 2, 2021; Ord. 124872, § 24, 2015; Ord. 123105, § 2, 2009.)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.