§ 11-3-16 — Monitoring Facilities
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 11-3-16
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/34b6042b-b703-484c-8779-f0f98b6a3d36
11-3-16. - Monitoring Facilities.
(a) Whenever the city manager finds it necessary, a user shall provide and operate, at its expense, monitoring equipment and facilities sufficient to allow inspection, sampling and flow measurements of the private sewer or internal drainage system. No owner of any new building constructed or proposed to be constructed in a zoned area other than residential, as classified in Section 9-5-2, "Zoning Districts," B.R.C. 1981, with a floor space of greater than five thousand square feet (5,000 sf) or with a water meter size of greater than three-fourths inch (¾-inch) shall fail to install a monitoring facility prior to final building inspection approval. (b) No user required to have a monitoring facility shall fail to situate the facility outside of the building on the user's premises. If the user's service line ties into an existing city utility access point and such utility access point allows for safe sampling and isolation of the user's discharge, the city manager may allow the utility access point to serve as the user's monitoring facility, but the city manager may require that the user provide and operate an alternate monitoring facility, if the city manager finds it is necessary. (c) Whenever required by the city manager, any significant industrial user or user discharging prohibited substances or specific pollutants serviced by a private sewer carrying nonresidential wastewater shall install a monitoring facility for each separate discharge that the city manager finds necessary to monitor. Each separate monitoring facility shall meet requirements set forth by the city manager with safe and independent access for city personnel at all times. (d) No user shall fail to maintain the utility access point or facility to allow for accurate sampling and preparation of samples for analysis. (e) No user shall fail to maintain the facility it owns and operates and all sampling and measuring equipment at all times in a safe and proper operating condition at the user's expense. (f) No user shall fail to construct the sampling and monitoring equipment and facilities in accordance with monitoring requirements found in this chapter and as set forth by the city manager and all applicable city construction standards and specifications within ninety (90) days following written notification by the city manager or before final building inspection approval, whether the facilities are located on public or private property. (g) No user shall fail to provide safe access to sampling and monitoring sites and pretreatment facilities at all times for authorized city personnel. Ordinance Nos. 5771 (1995); 7596 (2008); 8565 (2023)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
