25.18.410 - Crane Fee required before TCO/COO.
Developers operating Construction Cranes above the Downtown Building Height Limits in the Construction Crane Guidance Area shall be required to pay the Crane Fee prior to the City issuing a TCO or COO for the structure, whichever comes first.
(Ord. 30674.)