§ 27-27 — Construction activity application

Code of the City of Charleston, South Carolina (Supp. No. 115: codified through Ordinance No. 2026-092, enacted May 26, 2026) · Charleston, S.C., City Code § 27-27

Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/363bec14-4907-400c-b671-58f95c3b1e8d

Sec. 27-27. - Construction activity application.

(a) A submittal shall be made for all applicable construction, development, and re-development activities for review by the department of stormwater management. The entire application process and requirements shall be described in a Stormwater Design Standards Manual more fully described in section 27-28. (b) It shall be the responsibility of the applicant to provide a complete application package that meets the requirements of this article, the SWMP, and other state and federal regulations. Incomplete applications shall be returned to the applicant. (c) A maintenance plan for the stormwater management system shall be included with the construction activity application and shall cover activities to be conducted during and after construction, development, or re-development. As part of the maintenance plan, the property owner of such facility shall specifically agree through signature of covenants to be responsible for keeping the system and facilities in working order. (d) Construction and BMP maintenance and inspection schedules to be implemented during the construction activity and for as long as any stormwater facility is in service shall be included with the construction activity application. Required and recommended schedules for BMP maintenance and inspection are to be provided in the Stormwater Design Standards Manual. (e) Prior to the issuance of an approved application for construction activity: (1) The property owner shall execute a legal document entitled "Covenants for Permanent Maintenance of Stormwater Systems" which Covenants shall be recorded by the city in the office of the register mesne conveyance for Charleston County. The location of the facility, the recorded location of the covenants, and a statement of the property owner's responsibility for maintenance shall be included and also shown on the plat accompanying the construction activity application. In the case of an operator other than the property owner, a copy of a maintenance agreement between the operator and the property owner shall be included with the covenants, defining the operators' duties and responsibilities and a statement that the property owner shall be responsible for maintenance activities upon the termination of such maintenance agreement. (2) The property owner shall grant to the city a perpetual, non-exclusive, transferable easement, beginning or ending at a public street or other access point that allows for public inspection and emergency repair of all components of the drainage system related to the flow of the stormwater, including all conveyances and all water quantity and quality control facilities. At the request of the director of stormwater management or his designee, the property owner shall grant to the city rights-of-way necessary for the implementation and enforcement of this article. Stormwater quantity and quality control facilities shall be located so that required easements can be effectively used and ownership and maintenance responsibility can be clearly defined in deeds and plats. (f) When the director of stormwater management or his designee determines that additional storage capacity or pollutant load reduction beyond that required by the applicant for on-site stormwater management is necessary in order to enhance or provide for the public health, safety, and general welfare, to correct unacceptable or undesirable existing conditions or to provide protection in a more desirable fashion for future development, the city may: (1) Require that the applicant grant any necessary easements over, through, or under the applicant's property to provide access to or drainage for such a facility; and/or (2) Require that the applicant obtain from the property owner(s) over, through, or under where the stormwater management facility is to be located, any easements necessary for the construction and maintenance of same. (g) If the construction, development, or re-development activity is to be phased, no stage work, related to the construction, development, or re-development of stormwater management facilities shall commence until the preceding stage of work is completed in accordance with an approved application to perform the work. The procedure for construction, development, and re-development phases beginning and ending and what constitutes such conditions shall be developed by the applicant and submitted along with their construction activity application. (h) Before commencing any work to implement the approved construction activity application and upon completion of any phase or designated component of the site, the applicant shall notify the director of stormwater management or his designee. Notification schedules shall be provided for in the Stormwater Design Standards Manual. All self-inspections, maintenance actions, BMP replacements, and changes to the approved application shall be documented and presented upon request to the director of stormwater management or his designee.

(Ord. No. 2007-158, § 2, 8-21-07; Ord. No. 2018-150, § 1, 11-27-18)