§ 9-51 — Improvements
Code of Ordinances, City of Gulfport, Mississippi (Supp. No. 68: codified through Ordinance No. 3551, enacted January 20, 2026) · Gulfport Code of Ordinances § 9-51
Corpus is an independent public-information project, not the official City of Gulfport website. Stable reference: corpuslaw.us/code/365a6f76-a921-4f36-bf17-64f907904549
Sec. 9-51. - Improvements.
(A) General improvements. Street utility and other improvements shall be installed in each new subdivision in accordance with the standards and requirements specified herein. (B) Engineering requirements. Improvements required by these regulations shall be made in accordance with the specifications and under the supervision of the city engineer, county health officer, the commissioner of public works, the utility agencies or companies concerned with the tract or adjacent tracts, and other appropriate authorities. (C) Required improvements. (1) Monuments. Lot and block corners shall be marked with iron pipes at least one-half inch in diameter and sixteen (16) inches long. Angle points, points of curves in streets, the out-boundary corners of the subdivision and intermediate points as required by the city engineer shall be marked with either concrete blocks six (6) inches square and thirty (30) inches long, or with iron pipes two (2) inches in diameter and four (4) feet long; markers shall be provided with center points. (2) Roadways. Roadways, except roadways of major streets, shall be surfaced for their entire width and shall have roll-type, valley-type or vertical curb and gutter at each edge. The minimum acceptable all-weather surfacing shall be one and one-half (1½) inches of hot asphalt on six (6) inches of compacted gravel or equivalent base to provide adequate subsurface drainage. The construction of the roadways of major streets shall not be the responsibility of the subdivider. (3) Sidewalks. Sidewalks shall be provided on both sides of streets. They shall be four (4) feet wide and shall be located in the street right-of-way and on the property line. Crosswalkways shall be provided with paved walks four (4) feet wide; sidewalks and paved walks of crosswalkways shall be concrete at least four (4) inches thick. (4) Water supply. The subdivider shall construct a water distribution system with a water stub-out for each lot in the proposed subdivision. To avoid cutting pavement or roadway when connections are made, stub-outs shall extend from the main to the property line. (5) Sanitary sewerage. The subdivider shall install a sanitary sewer collection system with a stub-out for each lot in the proposed subdivision and shall connect such system to the public sanitary sewer. To avoid cutting pavement or roadway when connections are made, stub-outs shall extend from the sewer line to the property line. (6) Surface drainage. The subdivision shall be so designed that surface water will be drained into natural watercourses or into the municipal storm water drainage system. (7) Aboveground utilities. Aboveground utilities shall be placed in street rights-of-way except where it is necessary to place them on rear or side property lines of lots along easements provided for this purpose. (8) Street signs. Each intersection shall have signs on diagonally opposite corners identifying the streets which form the intersection. Construction and installation of street signs shall be in accordance with the requirements of the city engineer. (9) Streetlighting. All subdividers shall be required to pay all expenses associated with the operation and use of streetlighting until receipt by the subdivider of written notice of acceptance by the planning commission subsequent to the expiration of the one-year warranty period as required by subdividers for all improvements. (10) Standard and Federal Compliance to meet all State and Federal regulations including, but not limited to all ADA regulations and standards that may apply. (D) Guarantees of performance. (1) Completion of improvements. The mayor and city council shall not approve the final plat of any subdivision unless the improvements required by these regulations have been installed in accordance with the standards and specifications of the appropriate officials and agencies and their approval has been certified to the planning commission and to the mayor and city council. (2) Surety bond. In lieu of the completion of improvements prior to the submission of the final plat for approval, the mayor and city council may accept a bond in an amount and with surety and conditions providing for and securing to the municipality the actual construction and installation of such improvements within a period specified by the planning commission and expressed in the bond. (3) Warranty bond. Upon city council approval and acceptance of the subdivision final plat, and the approval of all installed improvements by the city engineering department, subject to a one-year warranty period, the developer shall provide a warranty bond or other acceptable surety to the city planning commission. The warranty bond shall equal five (5) percent of the construction cost of all improvements as determined by the engineering department. Upon the date of receipt of the warranty bond by the planning director, a one-year warranty period will begin during which the developer shall be responsible for the maintenance and repair of all improvements. At the conclusion of the warranty period and at the request of the developer, the city engineer will perform a final inspection of all improvements. When all improvements are deemed to be satisfactory, as evidenced by written notice of acceptance from the city engineer, which shall be subject to approval by the city council, the warranty bond shall be released; and the city shall assume perpetual maintenance of all improvements in the subdivision.
(Code 1963, § 23½-6; Ord. No. 1845, § 1, 7-5-89; Ord. No. 2827, § 1, 3-17-15)
Ask a question about Gulfport law
Corpus searches the Gulfport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
