§ 645-703 — Work in public rights-of-way
Revised Code of the Consolidated City and County of Indianapolis-Marion County (Supp. No. 47, Update 2: codified through Ordinance No. 42, 2026, passed June 1, 2026) · Indianapolis-Marion County Revised Code § 645-703
Corpus is an independent public-information project, not the official City of Indianapolis website. Stable reference: corpuslaw.us/code/36feab8b-5b85-40aa-aba8-977108770605
Sec. 645-703. - Work in public rights-of-way.
(a) All utilities desiring to work in, on, under or over the public right-of-way shall obtain all applicable permits as required in this article. In performing such work, the utilities shall be bound by the standards, regulations, procedures and guidelines set forth in this article except that: (1) A public utility shall not be required to file a performance bond with an application for a permit if the utility has on file with the permit section of the department of business and neighborhood services a statement signed by an officer of the utility wherein the utility agrees to indemnify the city against, and hold the city harmless from, any claim for damages arising out of the work of the utility (or persons, corporations or firms authorized by the utility) in a public right-of-way pursuant to any permit issued by the permit section of the department of business and neighborhood services. (2) A public utility shall not be required to file a written statement of insurance with an application for a permit if the utility has on file with the permit section of the department of business and neighborhood services the indemnification agreement specified in subsection (1) above. (3) A public utility shall not be required to obtain in advance any permit or permits to excavate within the public right-of-way or block or alter traffic patterns on any thoroughfare or street where such action: a. Is required in connection with making emergency repairs to underground, overhead or surface facilities; b. Is necessary because service to one (1) or more customers has been interrupted or is in danger of being interrupted and the interruption may result in personal injury or property damage to the customer, utility or some third party; or c. Is required to comply immediately with an order of a court or an agency having jurisdiction over the utility. Whenever a utility performs work in accordance with this exception, it shall notify the department of public works maintenance section by telephone during normal duty hours or, if after normal duty hours or on holidays or weekends, the permit section of the department of business and neighborhood services where such notification will be recorded by a telephone recording device. (4) A public utility shall not be required to obtain a right-of-way excavation permit to perform work, including excavating, in a public right-of-way unless the utility will make an excavation in or under the paved surface within the right-of-way. (5) A public utility shall not be required to obtain parking meter block out and removal permits, provided the utility reports all blockages to the parking meter section of the department of public works and pays, on a monthly basis, the blockage charges due. (b) All work including, but not limited to, the restoration of pavement, sidewalks or grass areas, shall be done by the utility at the expense of the utility, unless the city shall elect to do the work and charge the cost thereof to the utility. Such work shall be subject to the supervision and approval of the department of public works. (c) Adequate and appropriate water quality measures including, but not limited to, erosion and sediment control, inlet protection, concrete washout containment and dewatering filters, shall be implemented and maintained throughout the duration of the project to protect surface waters and the storm sewer system from pollutants. (d) All disturbed areas shall be restored with vegetation or pavement, as applicable, to stabilize the site. Vegetation restorations shall include adequate seed and erosion protection, such as an erosion control blanket. (e) Notice of work in public rights-of-way. (1) For purposes of this subsection, the terms "utility pole" and "wireless support structure" have the meaning set forth in House Enrolled Act 1318 (2015). (2) For purposes of this subsection, the term "residential area" shall mean any area zoned dwelling (zoning districts D-1, D-2, etc.) as set forth in the Indianapolis-Marion County zoning ordinance, as the same may hereafter be amended, replaced or recodified. (3) Except in an emergency where a failure to act immediately could lead to serious harm to public health or safety, at least twenty (20) days before placing a new utility pole or wireless support structure in a public right-of-way in a residential area, a utility or its contractor shall give notice to the department of public works. The notice shall be made electronically through email to the department of public works or access to the website of the department of public works. The notice shall contain a brief description of the work to be done, the expected timing for the work, and a contact telephone number for those who have questions about the work. At least ten (10) days before the work begins, the department of public works shall post the notice on its public website. (4) The notice requirement contained in subsection (3) does not apply to the replacement, repair or improvement of an existing utility pole or wireless support structure.
(Code 1975, § 31-3; G.O. 15, 2001, § 118; G.O. 45, 2015, § 1; G.O. 3, 2020, § 1; G.O. 16, 2022, § 47; G.O. 33, 2023, § 10)
Ask a question about Indianapolis law
Corpus searches the Indianapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
