Sec. 29-99. - Detention.

Developments also shall include temporary detention of stormwater runoff in order to minimize downstream flooding conditions. The following design criteria shall govern the design of temporary drainage facilities: (1) Storage volume. The volume of storage provided in the detention basin shall be sufficient to control the differential runoff from the twenty-five-year storm frequency of six-hour duration. The differential runoff is the volume and rate of flow of stormwater runoff discharged from a parcel of land or drainage area which is or will be greater than the volume and rate which pertained prior to proposed development for redevelopment. (2) Freeboard. Detention storage areas shall have adequate capacity to contain the storage volume of tributary stormwater runoff with at least six (6) inches of freeboard above the water surface of flow and the emergency spillway in a twenty-five-year storm. The entire structure should be designed for discharging the major storm. (3) Outlet control works. Outlet works shall be designed to limit peak out-flow rates from detention storage areas to or below peak flow rates for a twenty-five-year storm that would have occurred prior to the proposed development. Outlet works shall not include any mechanical components or devices and shall function without requiring attendance or control during operation. Size and hydraulic characteristics shall be such that all water and detention storage is released to the downstream storm sewer systems within twenty-four (24) hours after the end of the design rainfall. Normal time for discharge ranges from three (3) to twenty-four (24) hours. (4) Spillway. Emergency spillways shall be provided to permit the safe passage of runoff generated from a one-hundred-year storm or greater, if appropriate because of downstream high hazard, such as loss of life or damage to high-value property. (5) Design data submittal. In addition to complete plans, all design data shall be submitted as required in the detention design data submittal section of the drainage manual. (6) Detention methods. Depending upon the detention alternatives selected by the engineer of record, the design criteria for detention ponds shall follow those given in the drainage manual.

(Code 1961, § 35A-70(e))