§ 3 — Use-specific standards for large-scale solar energy collection facilities
Code of Ordinances of the City of Montgomery, Alabama (Supp. No. 27: codified through Ordinance No. 4-2026, enacted March 5, 2026) · Montgomery City Code, App. C, art. XI, § 3
Corpus is an independent public-information project, not the official City of Montgomery website. Stable reference: corpuslaw.us/code/37d28714-6b1f-4f2f-a8ed-4717936a7466
Sec. 3. - Use-specific standards for large-scale solar energy collection facilities.
The following standards apply to a large-scale solar energy collection facility: a. The maximum project size for a large-scale solar energy collection facility is 1,000 acres, whether the lot or lots on which the project is located is in single or multiple ownership. b. Except for fences and walls and gates providing access to the site, all equipment and structures associated with the facility shall comply with the dimensional standards that apply to principal buildings in the district in which the facility is located, or the following, whichever is more restrictive: 1. All solar panels and other equipment shall be set back at least 75 feet from the edge of the property line or right-of-way. 2. All inverters and other equipment permanently installed on the site that may be expected to contribute noise that may be audible off the site, other than solar panels, shall be set back at least 200 feet from the edge of the property line or right-of-way. 3. All equipment shall not exceed 25 feet in height. c. Except for transmission lines and collector utility structures, all utilities associated with the use shall be located underground. d. The use shall not create glare or shadows on adjacent land. e. The site shall have a planted landscape buffer in accordance with the following: 1. The planted landscape buffer shall be at least 20 feet in width and include, for every 100 linear feet of buffer, at least five canopy trees, five understory trees, and 100 shrubs. 2. The planted landscape buffer shall be located along the outer perimeter of the site and shall extend to the lot line or right-of-way line; however, the buffer may be located along shared access easements between parcels in nonresidential development. 3. The planted landscape buffer shall be shown on the site development plan, in accordance with article VI, section 8.3, landscape requirements for landscape plan review and approval, of this ordinance. 4. All vegetation in the planted landscape buffer shall be planted in accordance with article VI, section 8.5, general requirements, of this ordinance. 5. All trees included in the planted landscape buffer shall meet the standards of article VI, section 8.9, approved tree list, of this ordinance. All shrub plantings shall be spaced to achieve the screening goals and shall be a minimum of four feet in height within two years after planting. 6. The planted landscape buffer may have breaks necessary for site access. f. The application for a special exception shall include a clean-up plan in the event of a natural disaster such as a tornado or hurricane, details of how damaged solar panels that need to be replaced are disposed of and a decommissioning plan that describes the timeline and manner in which the facility will be decommissioned and provides that the site will be restored to a condition similar to its condition prior to the establishment of the solar farm land use. g. Prior to any site construction which for the purposes of this section shall not include pre-construction site preparation work, the applicant shall provide a performance guarantee in accordance with the following: 1. The applicant shall prepare an estimate of the cost to decommission the use and restore the site to a condition similar to its condition prior to the establishment of the solar farm land use. The cost and salvage estimates shall be submitted with supporting material including the cost assumptions and methodologies used to develop the estimates to the land use control administrator ("administrator") for the administrator's approval. The administrator may request additional information to support the applicant's decommissioning cost and salvage value estimates and may request revisions to the assumptions and methodology used to calculate them. Following the administrator's approval of the decommissioning cost estimate and salvage value estimate, the amount of the guarantee shall equal 115 percent of the estimated decommissioning cost, less 100 percent of the estimated salvage value. 2. The amount of the performance guarantee shall be reviewed at least every three years and adjusted based upon updated costs. 3. The performance guarantee shall remain in effect until the use is decommissioned and the site has been restored.
(Ord. No. 13-2025, 5-6-2025)
Ask a question about Montgomery law
Corpus searches the Montgomery sections it holds and shows the ones that match, with their citations. Free, no sign-in.