§ 66-102 — Meters; installation, reading and testing
Code of the Town of Gilbert, Arizona (Supp. No. 103: codified through Ordinance No. 2986, enacted June 9, 2026) · Gilbert Town Code § 66-102
Corpus is an independent public-information project, not the official City of Gilbert website. Stable reference: corpuslaw.us/code/37e334c7-cd20-44e2-99be-d9dc9b128f37
Sec. 66-102. - Meters; installation, reading and testing.
(a) All premises using water obtained from the town must be equipped with an adequate water meter furnished by the town but paid for by the consumer. A water meter shall be installed before any premises are occupied in a location that will be of easy access. (b) It shall be unlawful for any person to receive water on any lot within the town unless the director of public works shall have placed or directed the placing of a water meter upon each lot. When a lot with multiple buildings served by a single meter is further subdivided, a separate meter shall be required for each lot. If the owner, builder, contractor or developer fails to provide a separate meter for each subdivided lot, or diverts water from a water main without metering the water so diverted, the town may revoke or suspend the building permit or order the owner, builder, contractor or developer to cease and desist all construction activities on the subdivision until such separate meters are installed. Violations of this section shall result in a penalty of up to $2,500.00 per day per violation for each day the violation continues. (c) The director of public works shall read or cause to be read every water meter used for delivery of water supplied by the town at such times as are necessary in order that bills may be sent out at the proper time as may be directed by the town authorities. (d) Upon presentation of a verified complaint of the consumer and payment of the meter test fee established by the council to the director of public works, a municipal water meter shall be taken out and tested. If upon testing the meter is not within three percent of being accurate, it shall be repaired or replaced, and the meter test fee shall be credited to the consumer's next bill. The town shall have no obligation to test any meter more than once during a consecutive 12-month period. (e) If a tested meter is found to be more than three percent in error, the correction of previous bills will be made to the customer last served by the meter tested under the following terms allowing the town to recover or refund the difference: (1) The town shall adjust the customer's billing for consumption back to the date the meter error occurred or for a six-month period, whichever is shorter in duration. If the customer has been underbilled, the town will allow the customer to repay the difference over length of time equal to that of the underbillings or for a six-month period, whichever is shorter in duration. The customer will be allowed to pay the underbilling amount without penalties, interest or late fees, unless there is evidence of meter tampering or water diversion. Any underbilled amounts due by customer as the result of tampering or diversion shall be immediately due and payable. (2) If it is determined that the customer has been overbilled and there is no evidence of meter tampering or water diversion, the town will credit the account in an amount equal to the amount overcharged for the period of time such overbilling occurred or for six months, whichever is shorter in duration the corrected billing shall occur within the next billing cycle. If the account is closed, or the credit exceeds three months of utility service, the customer may request the credit be refunded to him after outstanding utility bills are paid. (f) If a meter is found to be non-functional (registering zero consumption) the correction of previous bills will be made to the customer last served by the meter by adjusting the customer's billing back to the date the meter error occurred or for a six-month period, whichever is shorter in duration. The town will allow the customer to repay the difference over the length of time equal to that of the underbillings or for a six-month period, whichever is shorter in duration. The customer will be allowed to pay the under billing amount without penalties, interest or late fees, unless there is evidence of meter tampering or water diversion. Any underbilled amounts due by customer as the result of tampering or diversion shall be immediately due and payable. Non-functional meters need not be tested, however, subject to the provisions of this section, the customer may request that a non-functional meter be tested. Requests for testing must be made within 60 days of the date the adjusted billing statement is generated.
(Code 1984, § 9-1-5; Ord. No. 1819, § I, 8-29-06; Ord. No. 2313, § I, 12-9-10)
Ask a question about Gilbert law
Corpus searches the Gilbert sections it holds and shows the ones that match, with their citations. Free, no sign-in.
