§ 22.170.190 — General requirements
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.170.190
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/38d9fdf6-8953-4a0a-939b-d299a4958f37
22.170.190 - General requirements
A. Earth Movement. Grading or other land disturbing activity shall not create or increase the likelihood of earth movement or the risk of damage due to earth movement, including, but not limited to, landslides, accelerated soil creep, settlement and subsidence, and hazards associated with strong ground motion and soil liquefaction of the site or adjoining properties. B. Natural Features. Each grading proposal shall contain provisions for the preservation of natural drainage patterns and watercourses; for reasonable preservation of natural land and water features and other indigenous natural features of the site; and, where necessary, replacement of vegetation or other means to control runoff. C. Watercourses. Grading shall not create or contribute to flooding, erosion, or increased turbidity, siltation or other forms of pollution in a watercourse, and shall comply with the applicable requirements of SMC Chapter 22.805. Watercourses shall not be obstructed. D. Pollution Control. Grading and other land disturbing activity shall be performed in accordance with, and the completed work shall be in accordance with, all applicable environmental laws, rules and regulations, and with the applicable requirements of SMC Title 22, Subtitle VIII, the Stormwater Code. E. Conformance with Application. Grading and other land disturbing activity shall be performed in accordance with the permit application approved by the Director except as allowed by Section 22.170.150, Modifications During Construction. F. Slopes. 1. Final graded slopes shall be no steeper than is safe for the intended use. Final graded slopes shall not be steeper than 2 horizontal to 1 vertical, except that the Director may approve permanent slopes of greater steepness based on a design by the geotechnical engineer of record. If a slope stability analysis is deemed necessary by the geotechnical engineer or the Director, the analysis shall show a factor of safety of at least 1.5 for static conditions and 1.1 for pseudostatic conditions. In areas of known unsuitable soils, the Director may require slopes of lesser steepness. 2. Slopes shall be designed and constructed in a manner that will minimize erosion. 3. For requirements for the slope of temporary stockpiles, see Section 22.170.190 M. G. Surface preparation. Areas that will receive fill shall be prepared by removing vegetation, non-approved materials, topsoil, and other unsuitable materials, including, but not limited to, mud, peat, and other materials with insufficient strength to satisfy the design, as determined by the Director. H. Topsoil. Native topsoil shall be retained in an undisturbed state to the maximum extent feasible, as defined in Chapter 22.801. Topsoil from areas that will be graded shall be reapplied to the site, where feasible. Topsoil that will be reused on-site shall be stockpiled on-site in a designated, controlled area, not adjacent to critical areas. I. Amendment with organic matter. Areas that have been cleared, graded, or compacted and that have not been covered by hard surface, incorporated into a drainage facility, or engineered as structural fill or slope shall be amended with organic matter prior to final inspection. J. Fills. Fills shall be located so that the base edge of the fill is located more than 12 feet horizontally from the top edge of an existing slope or a planned cut slope. A sloping fill shall not be placed on top of slopes that are steeper than 1.5 horizontal to 1 vertical. K. Requirements for fill material. Materials used in fills shall comply with the following requirements: 1. Material used in fills shall be appropriate to the site and the intended use of that portion of the site. 2. Any rock or other similar irreducible material used in a fill shall have no dimension greater than 12 inches and shall compose not more than 20 percent of the total fill material. 3. Topsoil shall not be used as a fill material except that the upper 12 inches of a fill site may consist of topsoil. 4. No frozen or thawing material shall be used as fill. 5. No solid waste, hazardous waste, or hazardous material may be used as fill. 6. No organic material shall be used as fill unless approved by the Director. 7. The Director may specify other characteristics of the fill material used, the degree of compaction, the moisture content, and the method of placement based on the intended use of the portion of the site where the fill will be placed and the requirements for water retention, drainage control, and erosion control. L. Terraces. The Director may require steps and terraces sufficient to control surface drainage and deposit of debris. Suitable access to the terraces shall be provided to permit proper maintenance. M. Subsurface drainage. Cut and fill slopes shall be provided with subsurface drainage when needed to maintain slope stability. N. Access. When an adjoining site relies on the site to be graded for pedestrian or vehicular access, the Director may require reasonable access to be maintained to the adjoining site. O. Stockpiling of earth materials 1. General. Stockpiling of any kind shall not adversely affect the lateral support or significantly increase the stresses in or pressure upon any adjacent or contiguous property. Stockpiling shall comply with the applicable erosion control requirements for temporarily exposed soils set forth in Section 22.805.010 and rules promulgated under that Section 22.805.010. 2. Temporary stockpiling during construction or grading. Temporary stockpiles of earth materials during construction or grading shall not exceed 10 feet in height. Stockpiles shall have slopes no steeper than 1 horizontal to 1 vertical. 3. Stockpiling and handling of earth materials in processing. Earth materials consumed or produced in a process may be stockpiled and handled on a site if the process is the principal use of the site. 4. Removal. Temporary stockpiles shall be removed prior to final inspection for a grading permit where no building permit is issued on the same site. Where grading is approved as a component of a building permit, temporary stockpiles shall be removed prior to issuance of a Final Certificate of Occupancy or approval for occupancy after a final inspection. P. Exploratory excavations. Exploratory excavations shall be performed under the direction of a licensed civil engineer or geotechnical engineer. No stockpiles of materials shall remain after completion of the exploratory activities. The grading shall comply with other requirements that may be established by the Director. Q. Excavations near footings or foundations. Excavations for any purpose shall not remove lateral support from any footing or foundation without first underpinning or protecting the footing or foundation against settlement or lateral translation. R. Land disturbing activity shall comply with provisions of applicable codes and rules promulgated by the Director describing actions and practices to protect potential archaeological and cultural resources during construction.
(Ord. 127391, § 3, 2026; Ord. 126357, § 7, 2021; Ord. 124952, § 1, 2015; Ord. 123107, § 1, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.