§ 11.22.230 — Building permits; inspection and risk assessment; inspection and work requirements
Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 11.22.230
Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/38f0c9ef-afbd-4f99-ba9f-61f9b4347e50
11.22.230 - Building permits; inspection and risk assessment; inspection and work requirements.
A. Regardless of whether the project or any part thereof is designed to substantially or permanently eliminate lead-based paint hazards, all building permit applications for demolition, renovation, or abatement on any building, structure, dwelling, or dwelling unit covered by this chapter shall be accompanied by a certification from an independent EPA-certified inspector that a lead inspection has been conducted within sixty (60) days of application. The application shall also include a corresponding Risk assessment report conducted by an independent EPA-certified risk assessor. The inspection may be conducted, and risk assessment report prepared by the City of St. Louis Lead Inspection and Hazard Control Division, which may charge a user fee to offset the cost of performing such service as determined by the Division. B. The applicant shall provide a complete and accurate list of the names and addresses of all contractors and subcontractors who have been engaged or hired to perform work together with name of each anticipated and actual lead abatement worker(s) in conjunction with the permit applied for under this section. Lead hazards outlined on the risk assessment report shall only be abated by a lead abatement contractor. The application shall include copies of current certifications held by the lead abatement contractor that will be used in the applied for permit and certification by the lead abatement contractor that the contractor participates in a registered apprenticeship under 29 CFR Part 29, Subpart A. C. The Building Commissioner shall deny a building permit application under this section if: 1. The application for building permit is not accompanied by the certifications and report as required under subsections A and B of this section; 2. If upon inspection, the independent EPA-certified inspector or risk assessor are also listed as a contractor or subcontractor performing work under the applied for permit, or share common interest, control, or employees with a contractor or subcontractor performing work under the applied for permit; 3. If upon inspection, the Building Commissioner determines the application proposes correcting conditions on the risk assessment report submitted under subsection A of this section by engaging contractors that are not lead abatement contractors or are lead abatement contractors that have forfeited their privilege of conducting such projects in the City of St. Louis. D. The Building Commissioner may contact the applicant and provide an opportunity to supply further information and documentation prior to denying the application for permit. E. Where a building, structure, or dwelling has been abated as certified by an independent certified lead inspector or the City of St. Louis Lead Inspection and Hazard Control Division or where an independent certified lead inspector certifies an acceptable level of lead bearing substances exist in the building, structure, or dwelling then the requirements of subsection A through C of this section shall be deemed satisfied by such certification and the building permit application for the immediate project at issue in the inspection and may not include a risk assessment report. Any additional project will require new inspection and certification for lead.
(Ord. No. 71646, 2-21-2023.)
Ask a question about St. Louis law
Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.