§ 74-514 — High risk operation and hotspot requirements
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-514
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/39544ea1-b9cb-4260-bb6f-43ec9185f5af
Sec. 74-514. - High risk operation and hotspot requirements.
In addition to the provisions of this article, new development and redevelopment that meets the definition of high risk operation or hotspot shall meet the following criteria: (a) No portion of the area of risk shall bypass the stormwater management system; (b) At a minimum, treatment method must be as specified in the Georgia Stormwater Management Manual and be designed for the specific pollutant of risk; and (c) High risk operations and hotspots shall not use permeable pavement to meet the performance standards of the article, except as approved by the commissioner based on detailed engineering studies and supporting documentation.
(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
