For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Requirements for Firetube Boilers

46 C.F.R. Part 52, Subpart 52.20
in effect

46 C.F.R. § 52.20-1 General (modifies PFT-1 through PFT-49).

46 C.F.R. § 52.20-17 Opening between boiler and safety valve (modifies PFT-44).

46 C.F.R. § 52.20-25 Setting (modifies PFT-46).