Computation of Slope
Reno Annexation and Land Development Code § 18.04.403
in effect18.04.403 - Computation of Slope
(a) Slope shall be computed on the existing slope of the land before any grading for the proposed development has commenced, as determined by a digital slope cell calculation or from a topographic map having a scale of not less than one inch equals 60 feet, and a contour interval of not more than two feet. Average slope of a development and slope cell sizes shall not be derived from lower resolution topographic data.
(b) Percent slope for cells shall be computed by dividing the contour interval by the horizontal distance between contour intervals then multiplying by 100 percent, or by a comparable digital slope analysis.
(c) For purposes of determining the applicability of a project to this article's standards, the average slope formula below or a comparable digital slope analysis shall be used.
Table 4-3 Average Slope Formula
S= (0.0023)(I)(L) / A
S = Average percent slope | L = Summation of length of contours in scale feet | I = Contour interval in feet | A = Area in acres of parcel being considered
(Ord. No. 6692, § 1(Exh. A), 1-8-25)
Source: City of Reno, Nevada, Administrative Code, City Charter and Annexation and Land Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/nv/reno/codes/land_development_code?nodeId=CH18.04DEST_ART4HIDE_18.04.403COSLFetched: 11/1/2026
