2-39 Map of pipes and other construction below surface of street to be made before paving.
Before paving or macadamizing any street, lane, alley or public way, the city engineer shall make an accurate survey of said street, lane, alley or public way and shall plot on a map the location of all sewer pipes, gas pipes, public or private water pipes, conduits, culverts or any other construction below the surface of the street.
(Rev. Ords. 1962, § 376)