Timing of Construction of Inclusionary Units.
Long Beach Municipal Code § 21.67.070
in effect21.67.070 - Timing of Construction of Inclusionary Units.
All required inclusionary units shall be made available for occupancy prior to, or concurrently with, the market-rate units. For the purposes of this subsection, "concurrently" means one of the following:
A. The inclusionary units may be constructed in phases if the market-rate units are constructed in phases, provided that the percentage of inclusionary units developed in each phase shall be equivalent to or greater than the total percentage of inclusionary units to be developed as part of the residential development until such time that all the inclusionary units have been built.
B. In-lieu fees, if applicable, have been paid.
C. The applicant has met, or made arrangements satisfactory to the City to meet, an alternative requirement as permitted by Section 21.67.080.
(ORD-22-0004 § 1, 2022; ORD-21-0006 § 1, 2021)
Source: City of Long Beach, Municipal Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/ca/long_beach/codes/municipal_code?nodeId=TIT21ZO_CH21.67INHO_21.67.070TICOINUNFetched: 10/28/2026
