§ 24-0311 — Right-of-way patching and restoration—Compliance with excavation code

Fargo Municipal Code, Fargo, North Dakota (Supp. No. 14, Update 5: codified through Ordinance No. 5555, adopted August 17, 2026) · Fargo Municipal Code § 24-0311

Corpus is an independent public-information project, not the official City of Fargo website. Stable reference: corpuslaw.us/code/3b84971a-4c5f-4558-ae44-0168b47c7806

24-0311. - Right-of-way patching and restoration—Compliance with excavation code.

A. Timing—The work to be done under the permit and the patching and restoration of the right-of-way as required herein must be completed within the date specified in the permit, increased by as many days as work could not be done because of extraordinary circumstances beyond the control of the permitee or when work was prohibited as unseasonable or unreasonable. B. Patch and restoration—Compliance with excavation code. Permitee shall patch and restore its own work in compliance with the excavation code, article 18-09 of the Fargo Municipal Code. C. Standards—The permittee shall perform patching and restoration according to the standards and with the materials specified by the director and the excavation restoration requirements in Fargo Municipal Code Article 18-09. The director shall have the authority to prescribe the manner and extent of the restoration, and may do so in written procedures of general application or on a case-by-case basis. The director in exercising this authority shall comply with excavation code standards for right-of-way restoration and shall further be guided by the following considerations: 1. The number, size, depth and duration of the excavations, disruptions or damage to the right-of-way; 2. The traffic volume carried by the right-of-way; the character of the neighborhood surrounding the right-of-way; 3. The pre-excavation condition of the right-of-way; the remaining life-expectancy of the right-of-way affected by the excavation; 4. Whether the relative cost of the method of restoration to the permittee is in reasonable balance with the prevention of an accelerated depreciation of the right-of-way that would otherwise result from the excavation, disturbance or damage to the right-of-way; and 5. The likelihood that the particular method of restoration would be effective in slowing the depreciation of the right-of-way that would otherwise take place. D. Guarantees—The permitee guarantees its work and shall maintain it for 36 months following its completion. During this 36-month period, it shall, upon notification from the director, correct all restoration work to the extent necessary, using the method required by the director. Said work shall be completed within five calendar days of the receipt of the notice from the director, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonal or unreasonable. E. Failure to Restore.—If the permitee fails to restore the right-of-way in the manner and condition required by the director, or fails to satisfactorily and timely complete all restoration required by the director, the director at its option may do such work. In that event, the permitee shall pay to the city within 30 days of billing, the cost of restoring the right-of-way. If permitee fails to pay as required, the city may exercise its rights under the construction performance bond.

Source: 2918 (1998).