§ 31-40 — Meters and settings to satisfy public works director or his/her designee
Code of Ordinances, City of Burlington, Vermont (Current through Ord. 8-3-26, passed August 3, 2026) · Burlington Code of Ordinances § 31-40
Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/3bf67fcf-867e-4a57-a659-f19ed98939e6
31-40 Meters and settings to satisfy public works director or his/her designee.
All meters and the setting of the same shall be satisfactory to the public works director or his/her designee. The water division shall be responsible for specifying type, size, installation, and periodic testing of all water meters. Meter size will be determined based on flow information supplied to them by the owner, developer or engineer, as applicable and be guided by the standards currently in use by the American Water Works Association.
(Rev. Ords. 1962, § 6018; Ord. of 10-22-90; Ord. of 8-10-15(1))
Ask a question about Burlington law
Corpus searches the Burlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
