Sec. 25-52. - Same—Construction permits.

(a) Each such permit for street closures for activities described in this chapter shall be requested in advance of the proposed street closure. Advance notification is waived when it is documented that the proposed work is of an emergency nature involving the public health, safety or welfare and such documentation is submitted to the official. (b) Each order for such closure shall accurately describe the part or parts of the street, alley, sidewalk or other public way to be closed, the period of such closure by the time and date of beginning and end thereof and the purpose therefor, and a copy of each such permit shall be promptly delivered to the city clerk, the chief of police and the chief of the fire department. (c) The official may waive the required permit for closure under the following conditions: (1) All conditions excepted from the permit requirements in this chapter, subject to the limits described in subsections (c)(2) and (c)(3); (2) For all proposed work conditions on local or residential streets, as defined by the director in the functionally classified street system, which is for less than eight (8) hours' duration and does not require more than one (1) consecutive eight-hour period; provided, however, appropriate traffic-control devices for the maintenance of vehicular and pedestrian traffic in accordance with city, state and federal guidelines shall be required; and, further provided, that persons performing work shall assume all responsibility and all liability for any and all damages, death or injuries resulting in any way from such work; and the performance of any work without a permit shall be deemed assumption of such responsibility and liability; (3) For all proposed work on collectors, minor arterials and principal arterials, as defined by the director in the functionally classified street system, which is for less than four (4) hours' duration; provided, however, that the transportation division shall be notified twenty-four (24) hours in advance of the commencement of the work, and further provided that all traffic lanes shall be open from 7:00 a.m. to 8:30 a.m. and 4:00 p.m. to 6:00 p.m. or as directed by the transportation division, and appropriate traffic-control devices for the maintenance of vehicular and pedestrian traffic in accordance with city, state and federal guidelines shall be required, and further provided that persons performing work assume all responsibility and liability for any and all damages, death or injuries resulting in any way from such work; and the performance of any work without a permit shall be deemed assumption of such responsibility and liability.

(Ord. No. 89-258, § 2(57-67), 10-5-89)