For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-46 — Protective measures

Code of Ordinances, City of Burlington, Vermont (Current through Ord. 8-3-26, passed August 3, 2026) · Burlington Code of Ordinances § 27-46

Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/3d310b85-9973-475a-a0cd-69bfd766039c

27-46 Protective measures.

(a) Every person, firm, corporation or department making an excavation or obstruction within the public way under a permit granted under this article must at all times maintain a railing around the excavation or obstruction site for so long as the same shall be unsafe or inconvenient for travel. The permittee shall in addition keep a suitable number of lights affixed to such railing or fence so as to provide adequate warning to approaching motorists or pedestrians of the excavation or obstruction. (b) The permittee(s) shall take appropriate measures to assure while an excavation or obstruction remains and during the performance of excavation work and until said work is accepted by the superintendent of streets or his designee, that traffic conditions shall be maintained as near normal as possible at all times so as to minimize inconvenience to the occupants of the adjoining property and the general public. (c) The superintendent of streets may require that the permittee(s) prepare a traffic-control plan in detail appropriate to the complexity of the work. Said traffic-control plan shall contain the following information: (1) Approval of the chief of police or his designee; (2) Approval of the chief of the fire department or his designee; (3) Approval of the superintendent of the traffic department or his designee; (4) Adequate warning, delineation and channelization by means of proper pavement markings, signing and use of other devices which are effective under varying conditions of light and weather to assure the motorist of positive guidance in advance of and through the work area; (5) Flagging procedures, if necessary, to control vehicular and pedestrian traffic; (6) Identification, and if necessary, the removal of inappropriate markings to eliminate any misleading cues to motorists under all conditions of light and weather; (7) Identification of what provisions, if any, will be made for the safe operation of work vehicles, particularly on high speed, high volume streets; (8) Estimated commencement date of excavation and/or obstruction and estimated date of completion of excavation and/or removal of obstruction. (d) Notwithstanding any requirements provided for under this section, every permittee shall comply with the standards set forth in the Manual of Uniform Traffic-Control Devices as adopted by the state.

(Ord. of 1-18-82)

Ask a question about Burlington law

Corpus searches the Burlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.