§ 7-13.4 — Recycling Mechanisms
City of Boston Code of Ordinances (2026 S-2: current through Ordinance 2025 C. 14, passed November 5, 2025) · Boston Municipal Code § 7-13.4
Corpus is an independent public-information project, not the official City of Boston website. Stable reference: corpuslaw.us/code/3db31133-de20-4a0a-8b62-95fd08111820
7-13.4 Recycling Mechanisms.
(A) On a schedule to be determined by the Commissioner, residential premises designated by the Commissioner shall be separate specified recyclables from all other solid waste that they deposit at the curb or other pickup locations for collection and shall place said recyclables in set-out containers for collection. The Department shall arrange for the collection of all said recyclables either through requirements of the regular district waste collection contract or through such other arrangements as the Commissioner determines to be most advantageous to the city. (B) The Commissioner shall develop and implement alternative recycling programs for residential premises where, in the judgment of the Commissioner, a curbside collection program is not feasible for either a specified geographic area or for specific classes of residences. (C) The Commissioner shall develop public education programs to maximize the separation and collection of recyclables. The Department may implement these programs in conjunction with the Boston Public Schools, Neighborhood Councils, community groups, private schools, businesses, labor organizations and other interested or affected parties. The education programs may include flyers, print and electronic media, public events or any other promotional techniques which the Commissioner determines will assure the greatest level of compliance with the provisions of this Section. Such programs shall begin at least one month before the effective date of separation requirements for specified residential premises, or a month before the start of operation of any alternative programs. (D) The Commissioner may adopt rules and regulations to further the effective implementation of recycling programs. (E) The Commissioner shall determine the most cost effective and appropriate means to bring about the construction and operation of a materials recovery facility or other similar facility to ensure adequate capacity for processing recyclables collected by the Department and its contractors under this Section. The Commissioner shall report the initial findings of this evaluation to the Mayor not later than July 1, 1991; and shall at that time seek whatever authority may be necessary to authorize the procurement and/or construction of such facility. The Commissioner may, from time to time, conduct additional evaluations of this nature in light of changing market conditions and shall report in a timely manner to the Mayor the results of such evaluations. (F) The Commissioner shall ensure that all separation and collection programs and all contracts for separation, collection and disposal are consistent with all commonwealth and federal solid waste laws and regulations, including, but not limited to, 310 CMR 19:017: “Waste Bans”. (G) The city-wide targets as defined throughout this Section shall describe the total amount of recycling of the residential wastestream occurring within the city at the relevant point in time. This shall include the results obtained through recycling of returnable plastic, glass and metal containers which are returned for deposit. The Commissioner shall prepare by July 1, 1991 a standard methodology consistent with that of the commonwealth of Commonwealth Department of Environmental Protection for quantifying the recycling results for returnable containers, and shall utilize that methodology annually in the preparation of reports required by this Section on the results of the recycling program. (CBC 1985 7-13.4; Ord. 1990 c. 9 § 4)
Ask a question about Boston law
Corpus searches the Boston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
