§ 17F.030.070 — Installation – Pressure Vessel Clearances
Spokane Municipal Code; partial · SMC 17F.030.070 · Effective
Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/3e094844-3d21-4d58-b26d-b270f271c73b
Section 17F.030.070 Installation – Pressure Vessel Clearances
When unfired pressure vessels are replaced or new vessels are installed in either existing or new buildings, manufacturer’s recommendation’s shall be used, but in no case less than eighteen inches shall be provided between the top of the pressure vessel and the ceiling and adjacent walls or other structures. All pressure vessels having manholes must have five feet clearance from the manhole openings and any wall, ceiling or piping that will prevent a person from entering the vessel. (Reference WAC 296-104-260)
Date Passed: Monday, August 14, 2006 Effective Date: Wednesday, September 27, 2006 ORD C33901 Section 15
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.
