§ 565-402 — Floodplain development permit and certification requirements
Revised Code of the Consolidated City and County of Indianapolis-Marion County (Supp. No. 47, Update 2: codified through Ordinance No. 42, 2026, passed June 1, 2026) · Indianapolis-Marion County Revised Code § 565-402
Corpus is an independent public-information project, not the official City of Indianapolis website. Stable reference: corpuslaw.us/code/3e58de5a-cf63-46aa-ac8e-861e23413fc7
Sec. 565-402. - Floodplain development permit and certification requirements.
A floodplain development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities in areas of special flood hazard. Ordinary maintenance and repair conducted under department of public works maintenance programs is excluded, such as mowing and activities required as part of necessary maintenance of drainage or flood control facilities so that the facilities will perform the function for which it was designed and constructed. An application for a floodplain development permit shall be made to the floodplain administrator and/or designee for all development activities located wholly within, partially within, or in contact with an identified special flood hazard area. A floodplain development permit shall not be issued for proposed activity in zone A or the BAFL until the floodway and floodway fringe boundaries and base flood elevation are established in accordance with this article or the best available data information. Such application shall be made by the owner of the property or his/her authorized agent, herein referred to as the applicant, prior to the actual commencement of such construction on a form furnished for that purpose. Such applications shall include, but not be limited to plans drawn to scale showing the nature, location, dimensions, and elevations of the area in question, existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the location of the foregoing. The floodplain administrator and/or designee, during the review of floodplain development permit applications located in identified in a special flood hazard area, shall ensure that specifically, the following information is required: (a) Application stage. All development shall comply with all provisions of this chapter. Application for a floodplain development permit shall be made on a form provided by the floodplain administrator and/or designee. (1) A description of the proposed development. (2) Location of the proposed development sufficient to accurately locate property and structure(s) in relation to existing roads and streams. (3) A legal description of the property site. (4) For the reconstruction, rehabilitation, or improvement of an existing structure, or an addition to an existing building, a detailed quote and description of the total work to be completed including but not limited to interior work, exterior work, and labor as well as a certified valuation of the existing (pre-improved or pre-damaged) structure. (5) A site development plan showing existing and proposed development locations and existing and proposed contours. (6) A letter from a licensed professional surveyor or engineer noting that an elevation reference benchmark has been established or confirmed for those projects requiring elevations to be met. (7) Verification that connection to either a public sewer system or to an approved on-site septic system is available and approved by the respective regulatory agency for proposed structures to be equipped with a restroom, kitchen or other facilities requiring disposal of wastewater. (8) The governing base flood elevation for the site (including the source of the base flood elevation value). Floodway and Floodway Fringe zones shall be delineated and labeled on the plans, primary plat, and the plat to be recorded. For Zone AE area, the plans and the plat must show the BFE topographic line the plan and plat must show the delineation study with the floodway and floodway fringe lines shown on the FIRM maps. Plans showing elevation of the top of the planned lowest floor (including basement) of all proposed structures in zones A, AH, and AE. In zone AO, plans must show the height of the top of the lowest floor above the highest adjacent grade. Elevation should be in NAVD 88. Flood protection grade denoted for each building pad and floor; volumetric calculations demonstrating compensatory storage; and, for each lot located in a Special Flood Hazard area, a plan note identifying the flood control zone in which it is located and the requirements and limitations. (9) Plans showing elevation (in NAVD 88) to which any non-residential structure will be floodproofed. (10) Plans showing location and specifications for flood openings for any proposed structure with enclosed areas below the flood protection grade. (11) Plans showing materials to be used below the flood protection grade for any proposed structure are flood resistant. Plans for proposed activities requiring a specified flood protection grade that involve land or watercourse alterations, or involve flood-proofing of a structure, shall be certified by a professional engineer, professional surveyor, or professional architect. (12) Plans showing how any proposed structure will be anchored to resist flotation or collapse. (13) Plans showing how any electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities are designed and/or located. Elevation should be in NAVD 88. (14) Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. A hydrologic and hydraulic engineering analysis is required, and any watercourse changes submitted to DNR for approval. Once DNR approval is obtained, a FEMA Conditional Letter of Map Revision must be obtained prior to construction. (See section 565-403(H) and section 565-405 for additional information.) (15) Any additional information, as requested by the floodplain administrator and/or his designee, that may be necessary to determine the disposition of a proposed development or structure with respect to the requirements of this chapter. (16) An application and permit fee shall be charged for the processing of a floodplain development permit application. A fee schedule shall be developed by the floodplain administrator and/or designee for categories of proposed activities sufficient to recover the cost of processing applications. (17) A floodplain development permit shall not be issued for any proposed activity until all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including but not limited to section 565-404 of the Federal Water Pollution Control Act Amendments of 1972, 33 USC 1334. (18) All National Flood Insurance Program regulations (codified at 44 CFR, Part 60.3) pertaining to state and federal permits, subdivision review, building permit review, floodproofing nonresidential structures, mobile home tie-down standards, utility construction, recordkeeping (including lowest floor elevations), and watercourse alteration and maintenance have been met. (19) The floodplain administrator and/or designee shall make all determinations and obtain all data in accordance with FEMA standards at 44 CFR 60.3. The permit applicant is responsible for supplying data to the floodplain administrator and/or designee that is required by FEMA. (20) When applicable, the floodplain administrator and/or designee shall supply each applicant for a floodplain development permit with a blank NFIP elevation certificate or flood-proofing certificate during the floodplain permit review process. The permit applicant will be required to submit the applicable certificate as outlined within the provisions of this chapter. (21) A floodplain performance surety as outlined within the general standards must be provided to the floodplain administrator by the applicant prior to issuance of the floodplain development permit when an elevation certificate or floodproofing certificate is required. (b) Floodplain development permit validity, transfer, expiration. (1) The approval of a floodplain development plan by the floodplain administrator and/or designee shall be valid for a period of one year from the date such approval was granted, or until the floodplain development permit for which the plan was submitted was issued, whichever occurs first. However, prior to the issuance of the permit, if there are any material changes to an approved floodplain development plan or circumstances that cause the floodplain development plan to be inaccurate or incomplete, then a new or corrected floodplain development plan shall be submitted to the department as a precondition for obtaining a floodplain development permit. (2) Transferring a permit. (a) A floodplain development permit may be transferred with the approval of the floodplain administrator and/or designee to a person, partnership or corporation that would be eligible to obtain such floodplain development permit in the first instance ("transferee"), after both the payment of a fee specified in the rules and procedures of the commission and the execution and filing of a form furnished by the floodplain administrator and/or designee. Such transfer form shall contain, in substance, the following certifications, release and agreement: (i) The person who obtained the original floodplain development permit or a person who is employed by and authorized to act for the obtainer ("transferor") shall: (ii) Certify under penalties for perjury that such person is familiar with construction activity accomplished pursuant to the floodplain development permit; such person is familiar with the floodplain development standards and procedures applicable to the construction activity; and to the best of such person's knowledge, information, and belief the construction activity, to the extent performed, is in conformity with all floodplain development standards and procedures; and (iii) Sign a statement releasing all rights and privileges secured under the floodplain development permit to the transferee. (b) The transferee shall: (i) Certify that the transferee is familiar with the information contained in the original floodplain development permit application, the detailed plans and specifications, the plot plan and any other documents filed in support of the application for the original floodplain development permit; (ii) Certify that the transferee is familiar with the present condition of the premises on which construction activity is to be accomplished pursuant to the floodplain development permit; and (iii) Agree to adopt and be bound by the information contained in the original application for the floodplain development permit, the detailed plans and specifications, the plot plan and other documents supporting the original floodplain development permit application; or in the alternative, agree to be bound by such application plans and documents modified by plan amendments submitted to the floodplain administrator and/or designee for approval. (iv) The transferee shall assume the responsibilities and obligations of and shall comply with the same procedures required of the transferor and shall be subject to any written orders issued by the floodplain administrator and/or designee. (v) A permit or design approval may not be transferred from the specified location to another location. 3. Expiration of floodplain development permits by operation of law. (a) If construction activity, other than activity involving the removal of all or part of a structure, has not been commenced within one hundred eighty (180) days from the date of issuance of the floodplain development permit, the permit shall expire by operation of law and shall no longer be of any force or effect; provided, however, the floodplain administrator and/or designee may, for good cause shown in writing, extend the validity of any such permit for an additional period that is reasonable under the circumstances, but in no event shall the continuance exceed a period of sixty (60) days. Such extension shall be confirmed in writing. (b) If the construction activity has been commenced but only partially completed, and thereafter substantially no construction activity occurs on the construction site over a period of one hundred eighty (180) days, the permit shall expire by operation of law and no longer be of any force or effect; provided, however, the floodplain administrator and/or designee may, for good cause shown in writing, extend the validity of any such permit for an additional period that is reasonable under the circumstances to allow construction activity to resume. (c) Construction stage. (1) The floodplain administrator and/or designee shall require that two NFIP elevation certificates be completed accurately and without errors by a professional land surveyor or registered professional engineer for each new structure, substantial addition, substantial improvement, or restoration of substantial damage located in a special flood hazard area (SFHA) as required by FEMA. (2) The applicant shall have a professional land surveyor or registered professional engineer complete the first of two (2) required NFIP elevation certificates, showing the as-built floor elevation at flood protection grade and lowest adjacent grade to the structure, and other information required in the form. The applicant shall deliver a signed and completed NFIP elevation certificate to the floodplain administrator and/or designee within ten (10) calendar days after completion of construction of the lowest floor grade. (3) The floodplain administrator and/or designee shall review the elevation certificate and construction activity shall halt until this review is complete. Any deficiencies detected during the review shall be corrected by the applicant before proposed development is permitted to continue. (4) Failure to submit the certificate or failure to make said corrections required hereby shall be cause to issue a stop work order for the project. (d) Finished construction. (1) Upon completion of construction of any structure requiring certification of elevation, the second elevation certificate that depicts the "as-built" lowest floor elevation and other applicable elevation data is required to be submitted by the applicant to the floodplain administrator within ten (10) calendar days. The elevation certificate shall be prepared by a professional land surveyor, professional registered engineer and certified by the same. (2) Upon completion of construction of an elevated structure constructed on fill, a fill report is required to be submitted to the floodplain administrator to verify the required standards were met, including compaction. (3) Upon completion of construction of a floodproofing measure for a non-residential structure, a floodproofing certificate is required to be submitted by the applicant to the floodplain administrator. The floodproofing certificate shall be prepared by a registered professional engineer, surveyor or architect as outlined within the flood-proofing certificate instructions, and certified by same, showing the as-built floor elevation at flood protection grade as provided by the flood-proofing measures constructed, and other required information on the form. (4) The department of business and neighborhood services shall not perform the final inspection of construction to a building requiring an elevation certificate or flood-proofing certificate until the floodplain administrator and/or designee has received and reviewed a properly completed elevation certificate or flood-proofing certificate. (5) Failure to submit a properly completed and compliant elevation certificate or flood-proofing certificate when applicable result in the issuance of a stop work order on the project by the floodplain administrator and/or designee, revocation of the floodplain development permit by the floodplain administrator and/or designee, or both.
(G.O. 22, 2024, § 1)
Ask a question about Indianapolis law
Corpus searches the Indianapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
