§ 10-138 — Mitigation of other adverse effects
Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 10-138
Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/3f92e2bb-2045-441f-9738-dc1e56274307
Sec. 10-138. - Mitigation of other adverse effects.
(a) The applicant bears the burden of proving no material weakening or damage of critical sand dunes. If the planning director finds that no material weakening of critical sand dunes or material damage to critical sand dunes will occur, as demonstrated by the applicant, the planning director shall then determine whether any adverse effects will result from the activity. If the planning director finds there will be adverse effects on critical dunes or dune vegetation seaward of the erosion setback line or in critical dune areas, the planning director may issue an erosion response permit only if the applicant demonstrates that adverse effects can be mitigated as required by the mitigation sequence. If the planning director issues an erosion response permit, it must include appropriate permit conditions incorporating the requirements of this article. (b) The mitigation sequence consists of the following requirements: (1) Avoidance. a. Avoidance means avoiding adverse effects altogether by not taking a certain action or parts of an action. An erosion response permit may not be issued allowing any adverse effects on critical sand dunes or dune vegetation seaward of the erosion setback line unless the applicant proves there is no practicable alternative to the proposed activity, proposed site, or proposed methods for conducting the activity, and the activity will not materially weaken the critical sand dunes or dune vegetation. The applicant shall include information as to practicable alternatives in the erosion response permit application. b. To avoid adverse effects on critical sand dunes and dune vegetation seaward of the erosion setback line, as required by subsection (b)(1)a. of this subsection, applicants may not: 1. Construct pipelines, except those that are exempt, seaward of the erosion setback line unless there is no practicable alternative. 2. Engage in any construction unless it is located as far landward of the critical sand dunes as practicable, except construction providing access to and from a public beach. 3. Construct any road parallel to the beach seaward of the erosion setback line, nor construct any other road parallel to the beach seaward of the erosion setback line. 4. Construct new artificial channels, including stormwater runoff channels, unless there is no practicable alternative. 5. Cause any such adverse effects for which the planning director determines there is a practicable alternative that would avoid such adverse effects. (2) Minimization. a. Minimization means minimizing effects on critical sand dunes and dune vegetation by limiting the degree or magnitude of the action and its implementation. Applicants shall minimize adverse impacts to critical sand dunes and dune vegetation by limiting the degree or magnitude of the action and its implementation. If the planning director determines that adverse effects on critical sand dunes or dune vegetation seaward of the erosion setback line cannot be avoided, the planning director may issue an erosion response permit allowing the proposed alteration, provided that the permit contains a condition requiring the applicant to minimize such adverse effects to the greatest extent practicable. b. To minimize unavoidable adverse effects as required by subsection (b)(2)a. of this section, applicants shall: 1. Locate nonexempt pipelines across previously disturbed areas, such as blowout areas, and minimize disturbance of dune surfaces where use of previously disturbed areas is not practicable. 2. Minimize construction and pedestrian traffic on or across dune areas to the greatest extent practicable, accounting for trends of dune movement and beach erosion in that area. 3. Route all pedestrian access to and from beaches through washover areas or over elevated walkways, and conspicuously mark all such access that is public with permanent signs so indicating. 4. Minimize the number of private access ways from any proposed subdivision, multiple dwelling, or commercial facility. In some cases, the minimum beach access may be only one (1) access way. In determining the appropriate grouping of access ways, the planning director shall consider the size and scope of the development. 5. Post signs in areas where pedestrian traffic is high explaining the functions of dunes and the importance of vegetation in preserving dunes. 6. Where practicable, provide vehicular access to and from beaches by using existing roads or from roads constructed in accordance with subsection (b)(1)b.3. of this section, unless public beach access is restricted, and where possible, improve existing access roads with elevated berms near the beach that prevent channelization of floodwaters. 7. Where practicable, locate new beach access roads in washover areas, blowout areas or other areas where dune vegetation has already been disturbed, construct such roads along the natural land contours, and minimize their width. 8. Where practicable, locate new beach access roads at an oblique angle to the prevailing wind direction. 9. Prohibit persons from using or parking any motor vehicle on, through, or across dunes outside designated access ways. 10. Maximize use of natural or existing drainage patterns when providing for stormwater runoff and retention. 11. Locate and construct new artificial stormwater runoff channels and retention basins so as to avoid erosion and unnecessary construction of additional channels and to direct all runoff inland and not to the Gulf of Mexico through dune areas. (3) Mitigation. a. Mitigation means repairing, rehabilitating, or restoring affected dunes and dune vegetation. Where adverse effects on critical sand dunes and dune vegetation cannot be avoided or minimized, the planning director shall set appropriate permit conditions requiring that applicants repair, rehabilitate, or restore affected critical sand dunes to at least the same volume as the pre-existing dunes and dune vegetation so that affected dunes will be superior or equal to the pre-existing dunes in their ability to protect adjacent public and private property from potential flood damage, nuisance, and erosion and to protect natural resources. The planning director shall consider the comments from the general land office, federal and state natural resource agencies, and dune vegetation experts in determining the appropriate mitigation method. b. Applicants may mitigate adverse effects on critical sand dunes using appropriate vegetative or mechanical means. Applicants shall: 1. Restore dunes to approximate the naturally formed dune position or location, contour, volume, elevation, vegetative cover, and sediment content in the area. 2. Allow for the natural dynamics and migration of dunes. 3. Use discontinuous or continuous temporary sand fences or a planning director approved method of dune restoration, where appropriate, considering the characteristics of the site. 4. Restore or repair dunes using indigenous vegetation that will achieve the same protective capability as or greater capability than the surrounding natural dunes. c. In authorizing or requiring restoration of dunes, the planning director shall give priority to stabilization of blowouts and breaches and priority dune mitigation locations identified in the erosion response plan. Before permitting stabilization of washover areas, the planning director shall: 1. Assess the overall impact of the project on the beach/dune system. 2. Consider any adverse effects on hydrology and drainage which will result from the project. 3. Require that equal or better public beach access be provided to compensate for impairment of any public beach access previously provided by the washover area. (4) Compensation. a. Compensation means compensating for effects on dunes and dune vegetation by replacing or providing substitute critical sand dunes and dune vegetation. Compensation consists of replacement of the affected critical sand dunes or dune vegetation on the site where the critical sand dunes and dune vegetation were originally located. The planning director shall set appropriate permit conditions requiring applicants to compensate for all adverse effects on critical sand dunes and dune vegetation that cannot be avoided, minimized, or otherwise mitigated. In setting appropriate conditions, the planning director shall consider recommendations of the general land office, federal and state natural resource agencies, and dune vegetation experts. Preference must shall be given to stabilization of blowouts and breaches and priority dune mitigation locations identified in the erosion response plan. b. Applicants shall follow the requirements of subsections (3)b.—c. and (4)e.3.—5. of this subsection when replacing critical sand dunes or dune vegetation. c. On-site compensation consists of replacement of the affected dunes or dune vegetation on the site where the dunes and dune vegetation were originally located or filling in voids in the existing critical foredunes. Applicants shall locate compensation efforts on the construction site, where practicable. d. An applicant may locate compensation efforts off the construction site if the applicant demonstrates that: 1. On-site compensation is not practicable. 2. The off-site compensation will be located as close to the construction site as practicable. 3. The off-site compensation has achieved a 1:1 ratio of proposed adverse effects on successful, completed, and stabilized restoration prior to beginning construction. 4. The applicant has notified FEMA, Region 6, of the proposed off-site compensation. e. Applicants shall provide the following information when proposing off-site compensation: 1. The name, address, phone number, and fax number, if applicable, of the owner of the property where the off-site compensation will be located. 2. A legal description of property intended to be used for the proposed off-site compensation. 3. The source of the sand and dune vegetation to be used. 4. All information regarding permits and certificates issued for the restoration of dunes and dune vegetation on the compensation site. 5. All relevant information regarding the success, current status, and stabilization of the dune restoration efforts on the compensation site. 6. Any increase in potential flood damage to the site where the adverse effects on dunes and dune vegetation will occur and to the public and private property adjacent to that site. 7. The proposed date of initiation of the compensation. f. Applicants shall compensate for adverse effects on dune vegetation by planting indigenous native vegetation on the affected dunes. Applicants may not remove existing vegetation from property not owned by the applicant unless the applicant includes in the permit application written permission from the property owner. The permit application must identify the source of any sand and vegetation which will be used in compensation. g. Applicants shall begin compensation prior to or concurrently with the commencement of construction. If compensation is not to be completed prior to commencement of construction, the applicant shall provide proof of financial responsibility in an amount necessary to complete the compensation, in the form of an irrevocable letter of credit, performance bond, or any other instrument acceptable to the city. h. Applicants shall notify the department in writing of the actual date of initiation within ten (10) working days after compensation is initiated. If the applicant fails to begin compensation on the date proposed in the application, the applicant shall state the reason for the delay. The planning director shall take this reason into account when determining whether an applicant has violated the compensation deadline. i. Applicants shall conduct compensation efforts continuously until the repaired, rehabilitated, and restored dunes and dune vegetation are equal or superior to the pre-existing dunes and dune vegetation. These efforts shall include preservation and maintenance pending completion of compensation. j. A compensation project is deemed complete when the position, contour, volume, elevation, and vegetative cover of the restored dunes are equal or superior to the pre-existing dunes and dune vegetation. k. The applicant shall be deemed to have failed to achieve compensation if a 1:1 ratio has not been achieved within three (3) years after the beginning of compensation efforts.
(Ord. No. 029541, § 10, 6-26-2012)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.