33.533.080 Monitoring and Power Density Measurements
A.
Monitoring. Monitoring of RF fields will occur as determined by the Healy Heights RF
Advisory Board, to confirm that conditions as described by An Investigation of
Radiofrequency Fields on Healy Heights, Portland, Oregon, Phase II, December 16, 1991,
have remained the same or changed in the manner predicted by subsequent approved
applications for change or addition.
1.
Monitoring must be performed by a qualified technician or engineer.
2.
Monitoring will consist of measurement of radiofrequency fields in a manner
comparative to and compatible with, the methodology used in and described by An
Investigation of Radiofrequency Fields on Healy Heights, Portland, Oregon, Phase I,
August 14, 1990.
3.
Monitoring must include at least the points used for narrow band measurements in
An Investigation of Radiofrequency Fields on Healy Heights, Portland, Oregon, Phases I
and II, plus a minimum of 10 other points identified in that document, falling outside
of and generally dispersed around the plan district.
4.
Monitoring will occur when there is reasonable cause to believe that one or more of
the facilities at Healy Heights is causing radiofrequency radiation in excess of the
levels allowed. Monitoring may occur at random.
B.
Required power density assessment.
1.
Calculation of power density. All applications for new or expanded facilities not
exempted by 33.274.030, will be accompanied by a calculation of the effects of the
proposed facility on the existing radiofrequency environment. The calculation of
power density must be made for the points used for narrow band measurements in
An Investigation of Radiofrequency Fields on Healy Heights, Portland, Oregon, Phases I
and II, plus a minimum of 10 other points identified in this document, falling outside
of and generally dispersed around the plan district.
2.
Measurement of power density. When calculations show that the majority of the
measurement points will have an increase of 25 percent of the difference between the
latest base line study of power density levels and the maximum power density
allowed, a new base line power density level must be established. A new base line will
be established by measuring the power density at, or as near as reasonably possible,
all measurement points identified in An Investigation of Radiofrequency Fields on
Healy Heights, Portland, Oregon, Phases I and II, after regular operation of the facility
has commenced. Final approval of the facility will be contingent upon documenting
compliance with the radio frequency emissions levels and exposure limits established
by the Federal Communications Commission (FCC).
C.
Method of power density measurements. All measurements, whether for monitoring or
required of an applicant, must be made in the manner described by the section entitled
Technical Approach, beginning on page 9 of An Investigation of Radiofrequency Fields on
Healy Heights, Portland, Oregon, Phase I, August 14, 1990. For the purpose of monitoring
radiofrequency fields, measurements need not necessarily occur at all points measured in
An Investigation of Radiofrequency Fields on Healy Heights, Portland, Oregon, Phases I and
II, but should occur as near to those points as reasonably possible and in sufficient number
to ascertain to what extent the radiofrequency environment has changed.