For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-24-12 — Minimum installation and maintenance controls

Memphis Code of Ordinances (Supp. No. 33: codified through Ordinance No. 5959, enacted May 12, 2026) · Memphis Code of Ordinances § 6-24-12

Corpus is an independent public-information project, not the official City of Memphis website. Stable reference: corpuslaw.us/code/4063f84d-e47b-4f9d-9ca3-01d162561f7b

Sec. 6-24-12. - Minimum installation and maintenance controls.

The following minimum controls shall apply to the installation, servicing and maintenance of all telecommunications system within city's rights-of-way, in addition to such other requirements as the city engineer may provide as a general or special condition of the right-of-way agreement: A. Installation and maintenance plan. Before commencing any installation, servicing or maintenance of a telecommunications system, the telecommunications company shall submit an installation and maintenance plan to the city engineer for review and approval within 14 days, and upon approval such plan shall be made a part of the right-of-way agreement. At a minimum, the installation and maintenance plan shall specify: 1. The location and method of installing each part of the telecommunications systems and facilities within the right-of-way; 2. The means by which access to and within the right-of-way shall be accomplished for the purpose of installing, servicing and maintaining each part of the telecommunications systems and facilities, including provisions for ingress and egress, parking of vehicles and equipment, and storage of materials; 3. The means by which the telecommunications company will provide for the control of traffic on the traveled way, if needed, in the course of installing, servicing or maintaining any part of the telecommunications systems and facilities; 4. The schedule for completing the installation of the telecommunications systems and facilities, or parts thereof, within the right-of-way. B. Preservation of pavement structure. Open cutting or trenching of the pavement structure of a street, highway or roadway, including without limitation the traveled way and shoulders, if any, shall not be permitted. Wherever the city engineer permits a crossing of the pavement structure of a street, highway or roadway in accordance with this chapter, the crossing shall be accomplished by boring or other untrenched method as approved by the city engineer. Open cutting or trenching of the pavement structure of a street, highway or roadway may be permitted in special circumstances where there is no reasonably practical alternative means of access and the telecommunications company has made adequate provisions for controlling access to the work zone, directing traffic, and protecting the safety of workers and the traveling public, as specified in the installation and maintenance plan approved by the city engineer. C. Access to right-of-way for installation and maintenance. As far as it is reasonably practical, all telecommunications systems should be designed and located in such a manner that they can be installed, serviced and maintained without direct access thereto from the traveled way. Such direct access may be permitted in special circumstances where there is no reasonably practical alternative means of access and the telecommunications company has made adequate provisions for controlling access to the work zone, directing traffic, and protecting the safety of workers and the traveling public, as specified in the installation and maintenance plan approved by the city engineer. D. Parking of vehicles. The telecommunications company shall not be permitted to park vehicles and equipment or to store materials on the city's right-of-way without express prior approval by the city engineer, except as may be required during actual installation and repair operations and while all required traffic controls are present and in place. E. Traffic control. 1. All traffic control signs or other traffic control devices that the telecommunications company may use in the course of any installation, servicing or maintenance of a telecommunications systems shall comply with the provisions of the Manual on Uniform Traffic Control Devices, T.C.A. § 55-8-153 and City Code sections 36-41 and 36-42. 2. If any installation, servicing or maintenance project is anticipated to significantly impede the flow of traffic on a divided street or roadway or on a major thoroughfare, the telecommunications company shall arrange for law enforcement officers having appropriate enforcement authority to be present to ensure the safe flow of traffic or as may be reasonably required in the installation and maintenance plan approved by the city engineer where access to the work zone has been permitted from the traveled way or areas appurtenant to the traveled way, except as the city engineer may otherwise expressly permit or require where the city engineer determines that it is not reasonably practical for grantee to comply with this requirement. In any event, except in emergency situations the telecommunications company may not conduct any such work within the traveled way without giving specific advance notice thereof to the city engineer, in the manner and at the times required by this chapter. 3. Advance notice of installation or maintenance work. Before performing any non-emergency servicing or maintenance of a telecommunications system at any location within traveled way or areas appurtenant to the traveled way the telecommunications company shall give at least two work days advance written or facsimile notice thereof to the city engineer, if timing of such work deviates from the plan in the approved permit. Advanced notice shall not be required for work associated with routine customer trouble reports of two hours or less. City engineer may waive the advance notice requirement, F. Emergency maintenance or repair. Compliance with the advance notice requirements of subsection E. of this section is not required of any person responsible for emergency excavation or demolition, for repair or restoration of service or to ameliorate an imminent danger to life, health, or property; provided, that such person gives the city engineer as soon as practicable, and written or facsimile notice thereof not less than 48 hours after the occurrence of an event requiring emergency maintenance or repair of a telecommunications system within the city's right-of-way if such facilities have not been restored in its original location. City shall provide prior notice, if possible, to grantee if it must move its telecommunications systems due to an emergency and allow grantee the opportunity to move such telecommunications systems. If this is not possible, city will contact grantee as soon as is practicable and inform grantee of any actions taken by city to the telecommunications system. G. Cessation of work for public safety. If the telecommunications company fails to comply with the traffic control plan or any other provision of the installation and maintenance plan, or if any activity of the telecommunications company within the city's right-of-way interferes with the safe and efficient use of the travelled way as determined by the city engineer, the telecommunications company shall immediately cease such activity upon notice being given by the city engineer, and the telecommunications company shall thereafter work with the city engineer to bring its activities into compliance with the installation and maintenance plan and/or implement such additional safety requirements as may be specified by the city engineer. H. Trees. With regard to new installations only, cutting or removal of trees along the city's rights-of-way shall not be permitted without the express approval of the city engineer. I. Hazardous substances. The telecommunications company shall not place, install or deposit any hazardous substance or hazardous waste within or on any part of the state freeway or state freeway right-of-way. If at any time the telecommunications company causes or allows a spill of a hazardous waste or substance within the freeway right-of-way, the telecommunications company shall remain solely liable for the clean-up and removal of such hazardous waste or substance. The telecommunications company shall indemnify the city and the city engineer, and their officers, employees and agents, and shall hold them harmless against any and all claims or expenses of any kind related to the deposit, spillage and/or clean-up of any such hazardous wastes or substances. J. Repair and restoration of premises. 1. The telecommunications company shall, as directed by and in a manner satisfactory to the city engineer, promptly replace or repair any portion of the pavement, shoulders, structures, ramps, guardrail, drainage, or any other part of the freeway that may have been damaged in the course of any work within the city's right-of-way. 2. Upon the completion of any installation, replacement, repair or relocation of telecommunications system within the city's rights-of-way, the telecommunications company shall promptly restore the premises to a condition similar to that which existed prior to such work, in a manner satisfactory to the city engineer. 3. The telecommunications company shall remain responsible for maintaining any excavation or trench on or along any city right-of-way, as directed by and in a manner satisfactory to the city engineer. K. As-built drawings. "As-built" drawings that adequately demonstrate the location, size length and nature of all underground and aboveground telecommunications systems located on, over or under the city's right-of-way shall be submitted by a telecommunications company to the city engineer within 120 days after completion of construction of such systems, if drawings are not submitted pursuant to section 6-24-12(A). Such drawing shall be in .pdf or other accepted industry format as reasonable to the size and scale of the project. Where the system is installed in duct, conduit or on poles owned by another entity, the owner shall be identified and the overall length, size, and shape of system installed in the shared facilities shall be indicated. A telecommunications company shall update such drawings within 60 days whenever material changes are made to such company's system which impact the public right-of-way. If so marked, all drawings and plans shall be treated as confidential and proprietary as applicable to the extent allowed by applicable law, but even if such drawings and maps are not protected from public disclosure by applicable law, the city shall not post such documents or maps on city websites. L. Completion of any installation or relocation. It shall be the responsibility of the telecommunications company to seasonably submit "as built" drawings of its facilities in the city's right-of-way and to provide other information upon request. M. Above ground markers. Telecommunications companies may install above ground markers to indicate the location of their facilities as long as such markers do create a hazard for the traveling public and are ADA passable.

(Ord. No. 5551, Art. XII, 11-18-2014)

Ask a question about Memphis law

Corpus searches the Memphis sections it holds and shows the ones that match, with their citations. Free, no sign-in.