§ 3.3.104 — CURB AND GUTTER TO CONFORM TO ALIGNMENT AND GRADE, AND TO BE CONSTRUCTED IN ACCORD WITH CITY STANDARD SPECIFICATIONS

City Code of Colorado Springs, Colorado (2026 S-22: current through Ord. 26-47, passed August 25, 2026) · Colorado Springs City Code § 3.3.104

Corpus is an independent public-information project, not the official City of Colorado Springs website. Stable reference: corpuslaw.us/code/40890119-7e84-4781-94c6-1faabf248f2c

3.3.104: CURB AND GUTTER TO CONFORM TO ALIGNMENT AND GRADE, AND TO BE CONSTRUCTED IN ACCORD WITH CITY STANDARD SPECIFICATIONS:

A. Curb or curb and gutter shall be constructed in accord with City Engineer standards and specifications. No curb or gutter shall be constructed until the proper line and grade has been approved by the City Engineer on plan and profile drawings prepared in accord with the public works design manual and subdivision policy manual. Curb or curb and gutter shall be constructed in accord with the approved lines and grades and shall be subject to the City Engineer's superintendence, direction and control, including an inspection and approval of the forms before any concrete work begins. The City Engineer may at any time permit any property owner or contractor to employ a Colorado licensed surveyor to set the proper alignment and grade for the installation of curb, gutter and sidewalk placed on public streets. The City Engineer may further permit at any time a sidewalk to be set without the required surveyor's stakes where curb and gutter has been previously installed, provided the contractor requests and receives an inspection and approval of the forms before the sidewalk is laid. It shall be unlawful for any person to construct, or cause to be constructed, any curb or curb and gutter in any manner different than provided in this part or upon any line or grade different from that established by the City Engineer. If any curb or curb and gutter is constructed at a line or grade other than as established or approved by the City Engineer, the City Engineer shall direct the responsible person to cause the curb or curb and gutter to be removed and relaid within a reasonable time at the responsible person's own expense. If the responsible person fails or refuses to relay the curb or curb and gutter to the proper line and grade, the City Engineer is authorized to do so, by using City work forces or by contract, and all costs may be charged to the responsible person. If the responsible person fails to pay any costs and charges within thirty (30) days after billing is mailed, the costs and charges shall be assessed to the abutting or adjacent real property or the real property subject to a public easement or right of way in the manner and with the effect provided in the City's sales and use tax ordinances. B. Inspection fees shall be established by resolution for curb, curb and gutter, sidewalk or other improvements. (Ord. 2424; 1968 Code §12-4; Ord. 91-11; Ord. 01-42)