For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 601.050 — Floodplain overlay zone variance

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 601.050

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/415f9304-e837-4042-b354-9a68b3245eb8

Sec. 601.050. - Floodplain overlay zone variance.

(a) Purpose. The issuance of a floodplain overlay zone variance is for floodplain management purposes only. Flood insurance premium rates are determined by federal statute according to actuarial risk and will not be modified by the granting of a variance. (b) Applicability. (1) Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one-half acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, in conformance with the provisions of SRC 601.050(b)(3), 601.050(b)(5) and 601.050(c). As the lot size increases beyond one-half acre, the technical justification required for issuing a variance increases. (c) Procedure type. Floodplain overlay zone variances are processed as a Type III procedure under SRC Chapter 300. (d) Submittal requirements. In lieu of the application submittal requirements under SRC Chapter 300, an application for a floodplain overlay zone variance shall contain the following information: (1) A completed application form; (2) Plans, of a size and form meeting the standards established by the Floodplain Administrator, showing: (C) The nature, location, dimensions, and elevations of the area in question; and (D) The location of existing and proposed structures, fill, storage of materials, and drainage facilities; (3) In riverine flood zones, the proposed elevation (in relation to mean sea level) of the lowest floor (including basement) and all attendant utilities of all new and substantially improved structures, in accordance with the requirements of SRC 601.040(b); (4) The proposed elevation in relation to mean sea level to which any non-residential structure will be floodproofed; (5) A certification by a registered professional engineer or architected licensed in the State of Oregon that the floodproofing methods proposed for any non-residential structure meet the floodproofing criteria for non-residential structures in SRC 601.075(c)(3); (6) A description of the extent to which any watercourse will be altered or relocated; (7) Base Flood Elevation data for subdivision proposals or other development when required pursuant to SRC 601.040(a) and SRC 601.070(b); (8) A substantial improvement calculation for any improvement, addition, reconstruction, renovation, or rehabilitation of an existing structure; (9) The amount and location of any fill or excavation activities proposed; (10) A floodplain mitigation assessment and mitigation plan in accordance with the requirements or SRC 601.100; and (11) Certification by a registered professional civil engineer is provided demonstrating through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment shall not result in any increase in flood levels within the community during the occurrence of the base flood discharge, when the development subject to the variance is located within the floodway. (e) Criteria. A floodplain overlay zone shall be granted if the following criteria are met: (1) The variance is the minimum necessary, considering the flood hazard, to afford relief. (2) The application for the variance includes a showing of good and sufficient cause; (3) Failure to grant the variance would result in exceptional hardship to the applicant; (4) The variance will not result in increased flood heights, additional threats to public safety, or extraordinary public expense, nor create nuisances, cause fraud on or victimization of the public, or conflict with existing laws or ordinances (5) The application for the variance includes a mitigation assessment and mitigation plan which has been prepared in accordance with SRC 601.100 that demonstrates no-net loss of the natural and beneficial functions of floodplains in the SFHA, including floodplain storage; water quality; and riparian vegetation; and (6) For variances within the floodway, the variance will not result in any increase in the flood levels during the base flood discharge; (7) For new construction and substantial improvements and for other development necessary for the conduct of a functionally dependent use provided that the criteria of SRC 601.050(b)(2), 601.050(b)(3) and 601.050(b)(4) are met, and the structure or other development is protected by methods that minimize flood damages during the base flood and create no additional threats to public safety. (f) Variance notification. Any applicant to whom a variance is granted shall be given written notice that the issuance of a variance to construct a structure below the Base Flood Elevation will result in increased premium rates for flood insurance and that such construction below the base flood elevation increases risks to life and property. Such notification and a record of all variance actions, including justification for their issuance shall be maintained in accordance with SRC 601.040(b).

(Ord. No. 6-25, § 1(Exh. A), 6-9-2025)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.