For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.820.030 — When a Master Plan Is Required

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.820.030

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/4236a308-3bf2-423c-b215-aadf7db113f2

33.820.030 When a Master Plan Is Required

A conditional use master plan is required as part of a conditional use review in the situations listed below. A. Large conditional uses. The conditional use contains over 500,000 square feet of floor area and either: 1. The use proposes to expand the amount of floor area over 10 percent from the amount that existed at the last conditional use review, or if there was no review, then January 1, 1991 or 2. The use expands its site area beyond the site area that existed on January 1, 1991. For this regulation, site area means all land used by the use and its affiliates including vacant land within the ownership. B. When required as part of a conditional use review. The review body, as part of a conditional use review, may require a master plan in conjunction with any future expansions of the use if there has been a history of site area expansions and these are likely to continue. Also, the master plan may be required for future expansion of the use if there has been a history of floor area expansions for functions of the use which draw additional people to the site, and these are likely to continue. C. Voluntarily. An applicant may also voluntarily submit a master plan as part of a conditional use review.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.