Development Related Permits.
Tyler City Code ch. 10, art. IX, div. C
in effectTyler City Code § 10-751 Erosion and Sedimentation Control Permit
Sec. 10-751. Erosion and Sedimentation Control Permit
When development or construction activities result in earth changes, soil erosion is likely to occur which will result in hazards to health and safety with damage to property under both normal rainfall events and/or heavy rainfall/flooding events, unless erosion and sedimentation control measures are implemented. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-752 Establishment of Development Permit
Sec. 10-752. Establishment of Development Permit
See Sections 10-555 and 10-556.
Tyler City Code § 10-753 Compliance and Development Permit
Sec. 10-753. Compliance and Development Permit
No structure or land may be located, altered or have its use changed or earth changes made without full compliance with this ordinance and other applicable regulations. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-754 Abrogation and greater restrictions; interpretation
Sec. 10-754. Abrogation and greater restrictions; interpretation
a. This ordinance is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this ordinance and another ordinance conflict or overlap, the more stringent restriction shall prevail.
b. In the interpretation and application of this ordinance, all provisions shall be considered as minimum requirements, liberally construed in favor of the City, and deemed neither to limit nor repeal any other powers granted under State statute. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-755 Designation of Administrator
Sec. 10-755. Designation of Administrator
The Development Services Engineer is designated to administer and implement the provisions of this ordinance. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-756 Grading Permit Required
Sec. 10-756. Grading Permit Required
Unless specifically exempted in writing, a grading permit shall be obtained from the City Engineer or designee prior to commencement of any development, excavating, grading, regrading, landfilling, beaming, paving, diking, clearing and grubbing, or other earth changes made to any property within the City. A separate permit shall be required for each separate, non-contiguous site or lot. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-757 Policies for Issuance
Sec. 10-757. Policies for Issuance
The issuance of a grading permit shall be governed by these policies and those set forth in the City Drainage Design Guideline Manual.
a. Earth changes shall be permitted which do not create a public hazard upon any property within the City through obstruction, impairment, sedimentation, blockage or alteration of any natural or artificial drainage facility or which do not create an unlawful diversion under the Texas Water Code.
b. Earth changes shall be permitted which do not channelize, obstruct or otherwise change any drainage facility in a manner inconsistent with the Drainage Design Guideline Manual, or requirements of the Federal Emergency Management Agency under the National Flood Insurance Program.
c. Earth changes shall be permitted which will not, in the opinion of the City Engineer, unreasonably increase surface runoff. However, this Article does not preclude or prevent the use of regional or off-site stormwater detention or retention facilities provided that adequate facilities to convey increased rates of stormwater runoff to the regional or off-site detention or retention facility are provided.
d. All earth changes shall be designed, constructed and completed so as to minimize loss of soil from a construction area in accordance with the Drainage Design Guideline Manual.
e. The requirements and conditions for a grading permit for any lot, parcel, or tract of land for which an Erosion Control Plan, Drainage Plan or Abbreviated Drainage Plan exists shall incorporate the provisions of the Drainage Plan or Abbreviated Drainage Plan. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-758 Grading Permit Requirements
Sec. 10-758. Grading Permit Requirements
A grading permit shall consist of a Drainage Plan or Abbreviated Drainage Plan, and an Erosion Control Plan. The grading permit for any lot to be used for building construction may not be issued unless the plan has been reviewed and accepted by the City Engineer.
A Drainage Plan shall consist of engineering drawings, contour maps, Erosion Control Plan and all supporting engineering calculations, as applicable to the land area covered by the Plan, which are required to demonstrate full compliance with this Article, the City of Tyler Design Guidelines for Subdivision Improvements, Best Management Practices of the U.S. Corp. of Engineers, Texas Council of Governments, or other Best Management Practices acceptable to the City Engineer.
a. Abbreviated Drainage Plans. Upon review of a grading permit application, the City Engineer shall determine if an Abbreviated Drainage Plan is necessary in order to meet the purposes of this Article. If an Abbreviated Drainage Plan is required, it shall be submitted to and reviewed by the City Engineer prior to granting of the grading permit. Although the Abbreviated Drainage Plan does not require the seal or signature of a registered professional engineer, it must be prepared according to the City format, as described in Section 10-529. An Abbreviated Drainage Plan will generally be sufficient for construction of single-family residences on subdivision lots. An Erosion Control Plan is required. An Abbreviated Drainage Plan is applicable to development sites of less than one (1) acre, and for all single-family residential lots.
b. Drainage Plans. Upon review of an application for a grading permit, the City Engineer shall determine if a Drainage Plan is necessary to meet the purposes of this Article. If a Drainage Plan is required, it shall be submitted to and reviewed by the City Engineer prior to granting of the grading permit. Drainage Plans are required on all development sites greater than one (1) acre, except for single-family residential lots.
c. The Drainage Plan, but not the Abbreviated Drainage Plan, shall be prepared and implemented under the direct supervision of a registered professional engineer, licensed to practice in the State, according to a City format. Each plan submitted for final review and acceptance shall bear the signature and seal of the submitting engineer under the following statement: “I hereby certify that I am familiar with the adopted ordinances, regulations, standards and policies of the City governing development, that these plans have been prepared under my supervision, and that this Drainage Plan complies with all governing ordinances and regulations to the best of my knowledge.”
d. If the site in question lies outside an area of special flood hazard, the plans shall bear the signature of the engineer or applicant under the following statement: “No part of this site lies within the established area of special flood hazard as established by the current flood insurance study of Flood Hazard Boundary Map. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-759 Exemptions
Sec. 10-759. Exemptions
A grading permit is not required for the following:
1. Bona fide agricultural and farming operations requiring no other permit, with the exception of tree harvesting operations;
2. Customary and incidental routine grounds maintenance, landscaping, and home gardening which does not require platting, replatting, variance request, or building permit and which does not affect stormwater drainage on or through the site;
3. Emergency repairs of a temporary nature made on public or private property which are necessary for the preservation of life, health or property, and which are made under circumstances where it would be impossible or impracticable to obtain a grading permit. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-760 Revocation or Suspension
Sec. 10-760. Revocation or Suspension
A grading permit may be revoked or suspended by the City Engineer or Construction Board of Adjustment and Appeals. Written notice shall be given to the permit holder stating the grounds for such action. A grading permit may be revoked or suspended upon one (1) or more of the following:
1. Violation of any conditions of the permit and any associated Drainage Plan or Abbreviated Drainage Plan after notification of non-compliance and failure to take remedial actions as outlined in these sections.
2. Violation of any applicable law, ordinance, or regulation pertaining to the grading permit contained in this Article after written notification of non-compliance;
3. Existence of any condition or performance of any act constituting a hazard or endangering human life or property. (Ord. No. 0-99-19; 2/24/99)
Tyler City Code § 10-761 Compliance
Sec. 10-761. Compliance
a. Unless exempted under this Article, it is unlawful to conduct any development, excavating, grading, regrading, excavating, landfilling, beaming, paving, diking, clearing and grubbing, or other earth changes either without a grading permit required under this Article, or contrary to the terms of a grading permit issued under this Article.
b. Upon revocation or suspension of a grading permit issued under this Article, it shall be unlawful to continue to conduct any development, excavating, grading, regrading, landfilling, beaming, paving, diking, clearing and grubbing, or other earth changes without having a valid grading permit in effect.
c. If it is determined that an individual is conducting activities without a grading permit required under this Article, or upon revocation or suspension of a grading permit, the City Engineer may issue a stopwork order on all construction activity on the individual’s property which may be directly or indirectly related to site drainage and which is being performed pursuant to any permits, licenses, franchises or contracts issued by the City. Such stopwork order may order a work stoppage on all construction activity on buildings or structures and all appurtenances thereto, including building, electrical, plumbing, mechanical, street work, storm sewer, sanitary sewer, gas lines and all utilities. Notices in writing and orders required by this Division shall be considered effective if served upon the parties concerned either personally or by certified mail, addressed to the individual, contracting party, or permittee at the address given on the contract document or permit application filed with the City.
d. In addition to the enforcement and penalties provided for in this Article, no certificate of occupancy for buildings or structures may be issued until the grading and drainage of the site has been constructed in accordance with the Plan required by this Division.
e. When a grading permit and Drainage Plan are required prior to issuance of a building permit, the structure for which the building permit is issued may not be used, occupied, or receive a certificate of occupancy unless the facilities as shown on the accepted Drainage Plan have been completed by the permit applicant or representative and reviewed and accepted by the City. Such acceptance will be made on the basis of certified as-built drawings prepared by a registered professional engineer. If the structure is in a designated special flood hazard area, it may not be used or occupied until an elevation certificate, properly completed, has been filed with the City.
f. Each day that a violation of this Division shall continue, or be permitted to continue, shall be deemed a separate offense. (Ord. No. 0-99-19; 2/24/99)
Source: City of Tyler, Texas, Code of Ordinances and Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/tyler/latest/tyler_tx/0-0-0-83474Fetched: 11/14/2026
