15.01.285 - Permit expiration.
Unless otherwise approved by the building official, the provisions of this section shall apply to all new and existing permits, regardless of the date of permit issuance. However, a permit issued prior to September 19, 2022, for construction of a swimming pool, spa, and/or hot tub, having an aggregate water surface area greater than 600 square feet for any residential property with an attached or a detached single family residential dwelling unit, shall comply with the provisions of subsection 15.01.286. A. Expiration. Every permit issued by the building official shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 calendar days from the date of issuance of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 calendar days, or if the building or work authorized by such permit exceeds three calendar years from the date of issuance of the original permit. B. Inspections required. Work shall be presumed to have commenced if a required inspection approval of work authorized by the permit has been obtained from the building official within 180 calendar days of the date of permit issuance. Work shall be presumed to be suspended or abandoned if a required inspection approval of work authorized by the permit has not been obtained by the building official within each 180 calendar days upon initial commencement of work authorized by such permit. Before such work can be recommenced, the permit shall be renewed as specified in subsections 15.01.285(C) and (D). C. Permit renewal—Work not commenced. For permits for which work has not been commenced in the first 180 days from the date of permit issuance as defined herein, the permit may be renewed provided that: 1. No changes have been made or will be made in the original plans and specification for such work. 2. The expiration has not exceeded three years from the original date of permit issuance. 3. The same edition of the technical codes are in effect as used in the initial review and approval of the construction documents. 4. A fee equal to one-fourth the amount required for a new permit is paid. 5. The renewed permit shall expire three calendar years from date of issuance of original permit. 6. The renewed permit shall expire if work is not commenced within 180 calendar days from renewal date. Where more recent editions of the technical codes have been adopted than used in the initial review and approval of the construction documents, such application for renewal shall be considered as a new submittal. Accordingly, all construction documents shall be updated to reflect the requirements of the current technical codes in effect, a full new review and approval of the construction documents by the building official is required, and a full new plan review fee shall be paid. In instances where, in the opinion of the building official, the changes in the construction document required to reflect compliance with the technical codes are minor in nature, the building official may reduce the plan review fee to reflect the actual total cost (direct and indirect costs) of reviewing the plans. Upon completion of the plan review, the permit may be renewed upon payment equal to one-fourth the amount required for a new permit. D. Permit renewal—Work commenced. For permits where work has commenced as defined herein and was subsequently suspended or abandoned as defined herein, the permit may be renewed provided that: 1. No changes have been made or will be made in the original plans and specification for such work. 2. The expiration has not exceeded three years from the original issuance date. 3. A fee equal to one-fourth the amount required for a new permit is paid. 4. The renewed permit shall expire three calendar years from date of issuance of original permit. 5. The renewed permit shall expire if work is not commenced within 180 calendar days from renewal date. E. New permit—Three years from date of original permit issuance. For permits that have exceeded three years from the date of original issuance, a new permit may be obtained provided that: 1. Construction authorized by the building permit has commenced and has received required inspection approvals as stated herein. 2. No changes have been made or will be made in the original plans and construction documents for such work. 3. A fee equal to the amount required for a new permit is paid, except that where the building official determines that construction has progressed to the point that a lesser fee is warranted, such lesser fee as determined by the building official shall be paid. Where more recent editions of the technical codes have been adopted than used in the initial review and approval of the construction documents, such application for a new permit shall be considered as a new submittal. Accordingly, all construction documents may be required to be updated to reflect the requirements of the current technical codes in effect. A full new review and approval of the construction documents by the building official may be required, and a full new plan review fee shall be paid. In instances where, in the opinion of the building official, the changes in the construction document required to reflect compliance with the technical codes are minor in nature, the building official may reduce the plan review fees to reflect the actual total cost (direct and indirect costs) of reviewing the plans. Upon completion of the plan review, a new permit may be issued. All work that has passed inspection may not be required to be updated to new codes. The maximum life of the new permit in accordance with this subsection shall be three calendar years from the date of permit renewal/issuance.
(Ord. No. 3906, § 4, 9-13-2022; Ord. No. 3141, § 1, 4-1-2014; Ord. 2736, § 1 (part), 2008)
Ask a question about Henderson law
Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.