For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19.09.030 — Conformance to plans

El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026) · El Paso City Code § 19.09.030

Corpus is an independent public-information project, not the official City of El Paso website. Stable reference: corpuslaw.us/code/4363fc71-ed52-4601-8d6a-980ce9c5373e

19.09.030 - Conformance to plans.

A. Conformance. Proposed capital improvements serving new development shall conform to and be properly related to the public facilities elements of the city's adopted comprehensive plan, other adopted master plans for public facilities and services including parks and open space, bikeway and transit, and applicable capital improvements plans, and shall meet the service levels specified in such plans. B. Thoroughfare Plan (Map) Amendments. No final plat shall be approved for any subdivision within the city or its extraterritorial jurisdiction until the applicant has made adequate provision for thoroughfares as shown on the thoroughfare plan (Map) as approved by the city. The thoroughfare plan is a guide for the roadway connections and types that will be needed in the future. Subject to city manager, or designee approval, as long as the connection is made, whether or not it is close to the exact alignment shown on the thoroughfare plan, no thoroughfare plan amendment should be necessary. The design and construction of the proposed thoroughfare shall be in conformance with the city's master plans for thoroughfares and with the City of El Paso Street Design Manual (SDM), and shall be subject to approval by the city manager or designee. If a different roadway type is found to be adequate or if the connection is not proposed to be made, then the thoroughfare plan shall be amended, upon provision of a traffic impact analysis of the proposed amendment in accordance with Chapter 19.18. C. Water and Wastewater Plans. No final plat shall be approved for any subdivision within the city or its extraterritorial jurisdiction until the applicant has made adequate provision for a water system and a sanitary wastewater system of sufficient capacity to adequately provide service to all tracts and lots within the area to be subdivided. The design and construction of the water system and of the sanitary wastewater system to serve the subdivision shall be in conformance with the El Paso Water Utilities master plans and construction standards for water and wastewater facilities and with the rules and regulations of the Public Service Board/El Paso Water Utilities and with the City of El Paso Street Design Manual (SDM), and shall be subject to approval by the utility manager. Subdivisions either in the ETJ or recently annexed and that are not served by the EPWU but by other systems shall either meet the same EPWU requirements or the requirements of the other utility provider but also be subject to approval by the city manager or designee.

(Ord. 16882 § 2 (part), 2008; Ord. No. 19327, § 13, 4-26-2022)

Ask a question about El Paso law

Corpus searches the El Paso sections it holds and shows the ones that match, with their citations. Free, no sign-in.