For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-307 — Inspections

Official Code of the City of Clarksville (Supp. No. 110: codified through Ordinance No. 64-2025-26, enacted May 7, 2026) · Clarksville City Code § 4-307

Corpus is an independent public-information project, not the official City of Clarksville website. Stable reference: corpuslaw.us/code/437814e0-df28-4de3-b6c7-9bfc789a8d49

Sec. 4-307. - Inspections.

1. Inspections of electrical installations will be conducted by city electrical inspectors. 2. Inspections are required on: a) Complete new installations with the exception of maintenance. b) HVAC equipment. c) New services or changes in services to existing installations. d) Additions to existing installations, such as swimming pools, water pumps, motor installations, additional rooms or spaces to existing buildings. e) Heat cable installations before being concealed by plaster, sheetrock or other methods. f) Conduit or raceways in or under masonry before covering with concrete or other permanent materials. g) Conduit or raceways installed in all structures. This inspection is required prior to the concealing of such conductors or raceways by wall covering materials or by insulation. h) Temporary services. i) Service release (required for all residential). j) Low voltage systems: All commercial, residential: security and fire alarm only. k) A minimum of two (2) inspections, (rough-in and final) shall be required on wiring installed within or on public and private buildings or other structures. No wiring or raceways shall be concealed until it has been inspected and approved by the inspector. A final inspection shall be requested upon completion of the entire electrical system. 3. The initial rough-in inspection is conducted when: a) All applicable circuit conductors and outlet boxes must be installed; b) All joints shall be made; c) All grounding connections must be in compliance with Section 300.10 of the National Electric Code. 4. The electrical or mechanical contractor is responsible for making sure the inspector has access to the job to be inspected. 5. The installer shall notify building and codes when the electrical installation is ready for inspection. 6. Whenever service equipment has been changed out or upgraded on any existing structures, an inspection will be required. 7. Inspections are not required on: a) Minor repair work, such as replacement of lamps or connection of portable devices to suitable receptacles which have been permanently installed. b) Installation, alteration, or repair of electric wiring or equipment installed by an electrical distribution agency for use in the generation, transmission, distribution, or metering of electrical energy. 8. Arc Fault Circuit Interrupters (AFCIs) shall be optional for bathrooms, laundry areas, garages, unfinished basements (which are portions or areas of basements not intended as habitable rooms and which are limited to storage, work or similar areas), and branch circuits dedicated to supplying refrigeration equipment. 9. For residential and commercial buildings, electrical power shall be supplied to the building in order for the inspector to perform final inspection.

(Ord. No. 12-2011-12, § 1, 9-1-11; Ord. No. 6-2018-19, 9-6-18)

Ask a question about Clarksville law

Corpus searches the Clarksville sections it holds and shows the ones that match, with their citations. Free, no sign-in.